|
The Building Is Under Construction, Located In Orzesze At Stanisława Wyspiańskiego Street, On Plot No. 854/2. The Task Includes The Reconstruction And Functional Change Of Rooms For The Purposes Of The Municipal Cultural Center And The Library, As Well As Land Development On Plots No. 855/2, 985/2, 986/2, 1023/2 And 1024/2 In Accordance With The Land Development Design. The Newly Developed Space Will Include: - For The Needs Of The Municipal Cultural Center: An Auditorium With Stage And Technical Facilities, A Cloakroom, Classrooms, Rooms Offices, Social Rooms, Technical Rooms, Archives, Warehouse And Hygiene And Sanitary Rooms. - For The Needs Of The Library: Book Rentals For Children And Adults, Audiobook Rental, Office Rooms, Research Department, Warehouses, Archives, Social Room, Hygiene And Sanitary Rooms. - Common Spaces Will Include Communication, Staircases, An Elevator Adapted To The Needs Of People With Special Needs And The Surroundings Of The Building With A Parking Lot. The Installation Will Be Subject To Reconstruction Water And Sewage, Electricity, Central Heating, And Mechanical Ventilation And Air Conditioning Will Be Installed. The Source Of Heating And Domestic Hot Water Remains Unchanged, Powered By The Main Gas Furnace. Building Parameters: Usable Area: 1,276.02 M2 Cubic Capacity: 4,230.98 M3 Area Of Hardened Surfaces: 2,586.49 M2 Attention! The Ordering Party Will Obtain A Decision Authorizing The Removal Of Trees Or Shrubs Interfering With The Scope Of The Planned Works And Will, At Its Own Expense, Cut Down Trees, Remove Wood And Plant Trees. The Subject Of The Order Also Requires: • Provision Of Full Geodetic Services By An Authorized Surveyor At Every Stage Of Construction Of The Facility As Well As After The Completion Of Construction For The Purpose Of Reporting The Completion Of Works, Including The Preparation Of An As-Built Geodetic Inventory In 4 Copies, Including Inclusion In The Geodetic Resources District Office• Ensuring, At Your Own Expense, A Source Of Water And Electricity For Construction Purposes And Installing Water And Energy Consumption Meters And Other Utilities, If Necessary. The Contractor Will Bear The Costs Of Energy, Water And Other Media Consumption During Construction, • Making The Necessary Arrangements (With The Managers Of The Technical Infrastructure Network Regarding The Organization Of Their Works And, Pursuant To These Arrangements, Incurring All Costs Related To These Arrangements) - The Contractor, At His Own Expense, Will Provide Specialized Industry Supervision And Acceptance To The Full Extent (Required By The Network Managers); • Carrying Out Tests, Checks And Tests Of Installations, Networks, Devices And Other Elements Of The Facility Not Included In The Bill Of Quantities And Required By The District Office Construction Supervision Inspector For The Occupancy Permit For The Expansion• Carrying Out Tests, Checking The Load-Bearing Capacity Of The Substructure, Compaction Of Balla
|