|
1. The Subject Of The Order Is The Thermal Modernization Of The Public Utility Building Of The Village Community Center In The Village Of Kostrza On The Plot With Registration Number 260/7, Kostrza District 0009, Together With Renovation And Accompanying Works As Part Of The Task Entitled: Program For The Modernization Of Public Utility Buildings In The Strzegom Commune - Village Community Center In Kostrza. The Investment Task Is Co-Financed By The European Funds For Lower Silesia 2021-2027 Program, Priority No. 9: European Funds For The Transformation Of Mining Areas In Lower Silesia, Measure No. 9.6 Environmental Transformation - Zit.2. The Subject Of The Order Should Include, Among Others: 1) Demolition And Dismantling Works, Digging And Bricking Up Furrows For Installations, Construction Of Passages Through Partitions, Assembly And Disassembly Of Scaffolding, 2) Replacement Of Old Window Joinery With Triple-Glazed Pvc Windows, Together With The Installation Of Automatically Controlled Pressure Vents, Work On The Windows, Painting Of Jambs, Replacement Of Internal And External Window Sills, 3) Replacement Of Door Joinery - External And Internal (Including Work On The Doors, Painting Of The Reveals After The Work, Installation Of Entrance Thresholds, Door Handles, Locks),4) Replacing The Heat Source With Air-Water Heat Pumps For Central Heating Purposes. And Domestic Hot Water Including An Electric Peak Boiler, With Modernization Of The Installation And Installation Of The Supporting Substructure And Accompanying Works, 5) Comprehensive Modernization Of The Central Heating Installation, Replacement Of Cables, Installation Of Underfloor Heating In The Main Room, Replacement Of Radiators With New Ones Equipped With Thermostatic Valves With Electronic Heads (Radio Control), Installation Of A Heat Buffer, Installation Of Radiator Covers, 6) Installation Of Domestic Hot Water And Circulation Systems With Thermal Insulation Of Cables, Replacement Of Batteries (Single Lever With Limited Operating Time With An Aerator On All Hot Water Spouts), 7) Delivery, Installation And Commissioning Of The Energy Management System In Accordance With The Detailed Design For The Industry - Sanitary Installations, 8) Installation Of Pv Panels With A Substructure And Energy Storage, Panels Connected To The Existing Modernized Electrical Installation, Mounted On The Roof, 9) Reconstruction Of The Existing Main Switchboard And Installation Of A Switchboard In The Boiler Room, 10) Replacement Of Electrical Installations, Including Replacement Of Existing Lighting Fixtures For New Energy-Saving Leds With Higher Efficiency (With Motion Detectors In Toilets) Along With Dismantling And Disposal Of The Existing Installation, Roughing And Reconstruction Works, Replacement Of Switches And Sockets, Tests And Measurements, 11) Insulation Of External Walls (Installation Of Thermal Insulation With Styrofoam Of Walls, Window Sills, Lintels And Jambs, Disassembly And Disposal Of Exis
|