|
Construction Work - Implementation Of The Investment Project Entitled: Relief Canal For The Strzyża Stream - Stage Ii. 1. The Subject Of The Order Is The Implementation Of The Investment Project Entitled: Relief Canal For The Strzyża Stream - Stage Ii. 2. The Order Is Divided Into Two Scopes: 1) Scope No. 1 - Basic, Which Includes The Implementation Of Construction Works Based On The Design Documentation Entitled: Relief Canal For The Strzyża Stream - Stage Ii, And 2) Scope No. 2 - Option, Which Includes The Implementation Of Construction Works Based On The Design Documentation Entitled: A New Skate Park For Wrzeszcz With A Basket For The Game In Park Nad Strzyża - Under The Citizens Budget 2023 In Gdańsk. For The Purposes Of The Implementation Of Scope No. 1, An Agreement Was Signed Between The Commune Of The City Of Gdańsk, On Behalf Of And For Which The Directorate For The Development Of The City Of Gdańsk Operates, And Gdańska Infrastruktura Wodociągowo-Kanalizacja Sp. Z O. O. 3. The Material Scope Of The Works Includes All Works, Activities And Works Necessary To Perform The Investment Task, Including In Particular The Following Elements: 3.1) Scope No. 1 - Basic, Which Includes: 1) Scope Of Drmg: A) Construction Of A New Section Of The Rain Collector, The So-Called Relief Channel For The Strzyża Stream, From The Intersection Of Ul. Wajdeloty From Ul. Waryńskiego To The Outlet To The Open Bed Of The Królewski Stream In The Nad Strzyzą Park In Gdańsk Wrzeszcz, B) Construction Of An Open Relief Canal Bed, C) Construction Of A Footbridge Over The Open Canal In Order To Safely Carry Out Pedestrian And Bicycle Traffic, D) Complete Reconstruction Of Ul. Danusia In Terms Of Existing Networks, Sidewalks And Surfaces, E) Greenery Development, Including Planting New Trees Within The Pedestrian And Bicycle Footbridge, Replanting Trees In Strzyża Park, Planting City Flower Pots And Restoring The Lawn. F) Installation Of Small Architecture Elements, I.E. Benches, Garbage Cans, Bicycle Racks, G) Construction Of Driveways And Entrances To The Property Along The Reconstructed Road System, H) Reconstruction Of Conflicting Underground And Above-Ground Utilities To The Extent Resulting From The Needs Of The Investment In Question And The Justified Requirements Of Individual Network Administrators, I) Reconstruction Of Fragments Of The Surface Of The Streets: Wajdeloty, Waryńskiego And Wyspiańskiego, J) Renovation Of The Pedestrian Crossing And Bicycle Crossing In The Street Wyspiańskiego - Use The Kn 1.3 Surface Structure, K) Restore The Surface In The Area Of The Works - Renovation Works In Accordance With The Detailed Design, L) Repair The Sidewalk At The Height Of The Property At Ul. Danusi 4D, M) Strengthening The Structure Of The Pavement Surface Leading To The Nad Strzyzą Park, N) Construction Of An Access Road To The Centrifugal Sedimentation Tank, O) Reconstruction Of The Existing Lighting With The Installation Of New Lighting Poles Styled On Prefabricated Foundations With Led Luminaires, P) Reconstruction Of The Collision Of The Power And Telecommunications Networks To The Extent Necessary For The Implementation Of The Investment, Q) Construction Of Flood Protection In The Form Of Guards At The Footbridge Pedestrian Zone Located In The Park At The Height Of Ul. Ludwika Mierosławskiego And Ul. Doctor Franciszek Kubacz – Security Is Binding
|