Architectural, Engineering And Planning Services – Haus Ortenau, Kjp Day Clinics - Property Planning. The Area To Be Converted Comprised Around 1350 M2 Of Usable Space. The Room Program Can Be Found In The Occupancy Planning And The Previous Technical Feasibility. There Is Essentially No Interference With The Basic Structure (Access, Room Structure, Etc.) Of The Building. For A Functioning Operation, Only Adaptation Measures To The Rooms Are Required Due To The Room Layout. This Includes, For Example, Demolition Work As Well As Drywall, Painting, Flooring And Carpentry Work. The Two Parts Of The Building Are Currently Only Structurally Connected To Each Other On The Ground Floor. However, From An Operational Organizational Perspective, A Connection Between The Two Parts Of The Building Must Be Planned On Levels 1, 2 And The Attic. Natural Lighting Must Be Provided Here. The Connecting Structure Was Developed With Structural Planning In The Context Of Technical Feasibility And Evaluated With Regard To A Cost-Effective Solution. By Creating 400 Square Meters Of Units, The Previously Required Second Escape Routes Using New Escape Stairs Are No Longer Required. To Ensure The Operation Of Child And Adolescent Psychiatry, Appropriate Security And Protective Measures Must Be Implemented. This Includes Converting All Windows To Make Them Lockable And Other Measures To Control The Accessibility Of The House. The Security Measures Also Include Securing The Outdoor Facilities. The Building Was Approved And Built As A Hotel-Like Use. It Can Therefore Be Assumed That An Application For A Change Of Use Must Be Submitted In Order To Use The Clinic. A Building Application Process Is To Be Assumed For The Connecting Corridor As A Staircase Between The Two Buildings. After Technical Feasibility Has Been Completed In October 2025, Work Phase 3 Must Now Be Planned. The Basis Is The Results Of Technical Feasibility. The Client Intends To Commission In 4 Performance Levels: - Performance Level I: Lp 1 - 4; Represented By The Ukf - Performance Level Ii: Lp 5; Represented By The Ukf - Performance Level Iii: Lp 6; Vbv - Performance Level Iv: Lp 7-9; Vbv Scope Of Services - Inventory Analysis Including Assessment Of Moisture Damage, Fire Protection Deficits, Static Reserves - Creation Of A Complete Functional And Area Concept According To The Ukf User Program - Planning Of The Building Connector (Staircase Structure) Between The Old And New Building - Development Of A Feasible Fire Protection Concept (Including Escape Routes, Closures, Usage Levels) - Approval Planning Including Change Of Use And Building Application For The Staircase Structure - Implementation Planning Lp 5 Including All Cuts, Details, Static Developments, Scheduling Processes As Well As Complete Integration Of The Structural Planning - Preparation Of The Procurement-Relevant Documents For Lp 6-7 (In Coordination With Vbv) - Property Monitoring Lp 8 Including Scheduling, Cost And Quality Control - Property Management Lp 9 Including Defect Management And Documentation - Planning Of All Measures For Suicide Prevention (Radiators, Fittings, Sanitary
Contact Information
Address
Breisacher Straße 153
Contact No.
+49 76127020657
Email
ariane.siegert@uniklinik-freiburg.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 106408505
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.