Works For Complete Or Part Construction And Civil Engineering Work – 25E0411 Niederauerbachkaserne Zweibrücken - Basic Renovation Of Functional Building A1. The Subject Of The Proposed Contract Is The Complete Gutting And Renovation Of The Former Functional And Accommodation Building A1 In The Niederauerbachkaserne In Zweibrücken. The Building, Which Has Been Vacant Since 2013 And Was Built In 1936, Is A 3-Story, Solid Existing Building With Three Full Floors (Ground Floor To 2Nd Floor) Including An Undeveloped Attic With A Walkable Attic And A Basement With A Full Basement With A Gross Floor Area Of Approx. 10,000 M² And A Building Cubature Of Approx. 33,300 M³. With Its Basic Renovation, The Building Is Intended To Become A Central Functional Building For All Paratrooper Companies Stationed In The Barracks With The Construction Of Several Teaching Halls, Office Rooms And Changing Rooms For Soldiers Not Required To Stay (Niuks Rooms), Including Sanitary Facilities. The Dimensions Of The Building Are: - Length: Approx. 120.00 M - Width: Approx. 17.00 M - Eaves Height: Approx. 10.50 M The Building Is Located Within A Monument Zone And Is Under Monument Protection And May Not Be Changed In Relation To The External Shape Of The Building. For The Listed Building, The Aim Is To Apply The Sustainable Building Rating System (Bnb) In Accordance With The Sustainable Building Guide Without Certification (Gold, Silver, Bronze). The System Variant Bnb Existing / Complete Modernization (Bnb_Bk) Is Used As The Basis For The Application Of The Sustainable Building Guide. In Addition To Extensive Pollutant Remediation, The Scope Of Construction Work Also Includes Pigeon Droppings Remediation, Which Is Mainly Carried Out In The Attic, In Accordance With The Applicable Regulations And Guidelines. The Gutting Work Includes The Partial Dismantling Of Non-Load-Bearing Interior Walls And Load-Bearing Ceiling Areas, Dismantling Of Existing Installations Of Technical Building Equipment (Electrical, Plumbing, Heating, Ventilation), Professional Dismantling And Disposal Of Materials Containing Pollutants In Accordance With The Pollutant Report After Separate Examination And Assessment, Exposing The Supporting Structure Down To The Shell Condition. The Renovation Work Includes The Repair Or Upgrading Of The Supporting Structure According To Static Requirements, Construction Of Room-Enclosing Components (Internal Walls Made Of Masonry And Drywall, Internal Insulation On External Walls, Replacement Of Ceiling Fields, Floor Structures), Repair Work In The Attic And Loft, Interior Work With Renewal Of Windows And Doors As Well As Wall, Ceiling And Floor Coverings Including Screed Work On All Floors, Painting Work On The External Facade, Renewal Of The Technical Systems (Heating, Ventilation, Plumbing, Refrigeration, Electrical, Data Technology) To The Current State Of The Art, Renovation Of The Outdoor Facilities Around The Building Plus The Construction Of A Disabled-Accessible Ramp To The Ground Floor. After Completion Of The Construction Project, The Bundeswehr Checklist Master Must Be Taken Into Account For The Final Building Inventory Documentation According To Rbbau Section F 2.
|