|
The Subject Of The Task Is Construction Works Including Thermal Modernization Of The Building Of The Primary School In Gogołowa. The Scope Of Work Includes: - Thermal Modernization Of The Facility (Insulation Of Foundation Walls, External Walls Along With Insulation Of The Flat Roof, Roof And Ceilings Above The Heated Top Floor), - Replacement Of External Windows And Doors, - Replacement Of Central Heating Installations. - Construction Of A Photovoltaic Installation With Reconstruction Of The Internal Installation, Lightning Protection Installation, Together With The Reconstruction Of The Telecommunications Installation. The Scope Of Work Covered By The Order Does Not Include: - Execution Of Mechanical Ventilation, - Renovation Of Reinforced Concrete Cladding Of The External Stairs On The Southern Facade, - Painting Of The School Premises, Except For The Walls Where The Door And Window Joinery Was Replaced, - Renovation - Painting Of The Roof Covering, - Renovation Of Chimneys Above The Roof, - Execution Of Walls. From Plasterboards On The Ground Floor Of Room 1.27 - Storage Room Along With The Removal Of The Existing Transparent Partition - Vestibule And Installation Of Internal Door Joinery - 2 Doors, Supplementation And Changes To The Scope Of Works - In Room 1.4 Bathroom, An Aluminum Window With An External Color Similar To Pvc Windows Should Be Installed. Ei30 Fire Protection Window. Left Wings (From The Kindergarten Room Side) Turn And Tilt, - In The Corridor Of The Room. 1.24, An Ei30 Non-Opening Aluminum Fire-Resistant Window With An External Color Similar To Pvc Windows Should Be Installed, - Doors Should Be Installed In All External Doors, Doors Equipped With Patented Cylinders - 5 Keys, - Doors To Rooms: 1.0 Vestibule, 1.11 Vestibule And 1.21 Vestibule Should Be Equipped With An Electromagnetic Reversal Lock Or Electric Strike. Reversible With Wiring To Existing Buttons, Numeric Keypads - Door Opening Control Using Codes And Cards. The Armature On The Active Wings. (Doors D6, D7, D8). - Due To The Size Of The Windows And The Division Of The Window With The Upper Tilt-And-Open Sections, It Is Required That The Upper Sections Be Tilted From The Floor Level Using External Fittings, Without Using A Ladder. Guidelines For The Implementation Of Works: - The Replacement Of Window And Door Joinery Must Take Place Outside The Schools Operating Periods, I.E. During The Winter Holidays From February 16, 2026 To March 1, 2026, And Holidays From June 27, 2026 To August 31, 2026 Or On Another Date After School And Kindergarten Hours Or On School Holidays. If Work Is Carried Out After School Or Kindergarten Hours, The Room Covered By The Work Should Be Tidied Up In A Way That Allows Classes With Children To Be Carried Out The Next Day (I.E. Removing Foil Protection, Removing Debris, Washing The Rooms). The Ordering Party Allows Other Dates For The Completion Of Works After Obtaining The Written Approval Of The Principal Of The Primary School In Gogoł
|