Stadium Construction Work – Unio Stadium Modernization And Extension. Description Of Works: Design Services, Technical Assistance And Execution For The Objective Modernization And Expansion Of The Unio Stadium In The Municipality Of Satu Mare. The Works Will Be Carried Out In Compliance With The Legislation In Force And Good Practices In The Field Of Construction, Based On The Approved Technical Documentation, So That The Stadium And The Playing Surface Meet The Quality Standards Established By The Romanian Football Federation And Uefa (For League Ii And The Possibility Of Homologation For League I). Technical Measures And Solutions: Complete Dismantling Of Existing Constructions (C1–C3): - Tribune With Damaged Reinforced Concrete Structure, With Beams, Pillars And Floors Affected By Advanced Corrosion; - Improper Annexes (Locker Room, Workshop), Without Thermal Protection, With Degraded Walls And Roofs; - The Symbolic Preservation Of A Fragment Of The Former Tribune, As A Memorial Landmark (Gesture To Preserve The Memory Of The Place). Construction Of A New Main Tribune And A Secondary Tribune, According To Frf/Uefa Standards: - Use Of Prefabricated Reinforced Concrete Elements For Stands, Pillars And Floors; - Roof Structure In Glued Laminated Wood, With Heat-Insulating Panels And Water-Tight Covering System; - Foundations On Drilled Piles, Dimensioned According To The Geotechnical Conditions Of The Site. Complete Functional Reconfiguration Of The Complex: - Clear Zoning Of Spaces For Athletes, Press, Vip, Public And Technical Staff; - Separate Vertical And Horizontal Circulations And Rapid Evacuation According To P118; - Lift For Disabled People And Dedicated Platforms (According To Law 448/2006). Integration Of Modern Energy-Efficient Installations: - Air Conditioning With Vrf (Variable Refrigerant Flow) Systems, Heating By Heat Pumps And Mechanical Ventilation With Heat Recovery; - Full Led (Light Emitting Diode) Lighting, Both Indoor And For The Field, According To Uefa Requirements; - Possibility Of Automation And Centralized Bms (Building Management System) Control. Measures For Energy Performance And Nzeb (Nearly Zero-Energy Building) Compliance: - Thermal Envelope Sized According To Mc001/2022 And C107/2005; - Elimination Of Thermal Bridges And The Use Of High Performance Materials; - Implementation Of A Rainwater Reuse System For Irrigation, With Local Collection And Storage, As Well As The Exploitation Of Wells Drilled At Depths Between 50 And 100 M To Supply Water To The Irrigation System; - The Provision Of Photovoltaic Panels For The Production Of Electricity And Thermal Solar Panels For The Preparation Of Hot Water. Measures For Fire Safety And Civil Protection: - Appropriate Compartmentalization, Escape Routes Sized According To Np 051 And P118; - Detection, Signaling And Extinguishing Installations (Internal, External Hydrants, Water Tank); - Access Area For Fire Brigade Intervention
Contact Information
Contact No.
+40 261807520
Email
achizitii@primariasm.ro
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 106353197
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.