|
Preliminary And Indirect Services - Construction Site - Rental Of A Storage Type Container - Minimum Area Of 13, 80 M2, Open Shed To Support Production (Carpentry, Armature Center, Workshop, Etc.) With Scissors, 4Mm Tile, Bleached Concrete Floor, Container Rental - Bathroom With Showers And Vases - 4, 30 Af_03/2024, 16/12/2025 - 10:30:45, Hydrometer Dn 1/2, 1, 5 M3/H - Supply And Installation. Af_03/2024, Electricity Input, Overhead, Three-Phase, With Recessed Box, 10 Mm2 Cable And Din 50A Circuit Breaker (Concrete Post Not Included). Af_07/2020, Supply And Installation Of Workplate With Galvanized Sheet And Wooden Structure. Af_03/2022_Ps, Removal Of Separated Construction Site Debris Using A Metal Bucket - Earth, Masonry, Concrete, Mortar, Wood, Paper, Plastic Or Metal, Siding With Metal Tile. Af_03/2024, Preliminary And Indirect Services - Local Construction Administration - Junior Civil Engineer With Additional Charges, Preliminary And Indirect Services - Mobilization And Demobilization - Mobilization And Demobilization Of Site, Preliminary And Indirect Services - Support Equipment - Rental Of Metal Scaffolding Type Facade, Pieces Of Approximately 1.20 M In Width And 2.0 M In Height, Including Diagonals In X, Connection Bars, Shoes And Other Items Necessary For Assembly, Including Assembly And Disassembly, Foundation - Conventional Location Of The Work, Using A Template Of Running Boards With Points Every 2.00 M - 2 Uses. Af_03/2024, Mechanized Trench Excavation With Prof. Up To 1.5 M (Average Upstream And Downstream/One Composition Per Section), Backexcavation. (0.26 M3), Width. From 0.8 M To 1.5 M, On 1St Category Soil, In Locations With A High Level Of Interference. Af_09/2024, Manual Trench Excavation. Af_09/2024, Ballast With Granular Material (Crushed Stone N.1 And Crushed Stone N.2), Applied On Floors Or Slabs On Ground, Thickness Of *10 Cm*. Af_01/2024, Manufacture, Assembly And Disassembly Of Formwork For Crowning Block, In Sawn Wood, E=25 Mm, 4 Uses. Af_01/2024, Block Frame Using 5 Mm Ca-60 Steel - Assembly. Af_01/2024, Block Frame Using 6.3 Mm Ca-50 Steel - Assembly. Af_01/2024, Block Frame Using 8 Mm Ca-50 Steel - Assembly. Af_01/2024, Block Frame Using 10 Mm Ca-50 Steel - Assembly. Af_01/2024, Block Frame, Insulated Footing, Baldrame Beam And Running Footing Using 12.5 Mm Ca-50 Steel - Assembly. Af_01/2024, Baldrame Beam And Running Shoe Using 16 Mm Ca-50 Steel - Assembly. Af_01/2024, Concreting Of Crowning Block Or Baldrame Beam, Fck 30 Mpa, Using A Pump - Laying, Densifying And Finishing. Af_01/2024, Spreading Material With Crawler Tractor. Af_09/2024, Manual Trench Backfilling, With Percussion Soil Compactor. Af_08/2023, Surface Waterproofing With Asphalt Emulsion, 2 Coats. Af_09/2023, Technological Control Of Concrete, Structure - Pillars - Assembly And Disassembly Of Formwork For Rectangular Pillars And Similar Structures, Simple Right Foot, Made Of Resin Plywood Sheet, 6 Uses. Af_09/2020, Pillar Or Beam Frame Of Conventional Reinforced Concrete Structure Using 10.0 Mm Ca-50 Steel - Assembly. Af_06/2022, Structure Of Pillar Or Structural Beam
|