|
Lot 1 - Pull-Out Test, Lot 1 - Test Of Mortar For Laying And Coating Walls And Ceilings - Tensile Strength In Flexion And Compression, Lot 1 - Test For Industrialized Adhesive Mortar For Laying Ceramic Tiles - Determination Of Open Time, Lot 1 - Test For Industrialized Adhesive Mortar For Laying Ceramic Tiles - Determination Of Tensile Adhesion Strength, Lot 1 - Refractory Materials — Determination Of Water Retention Time Of Mortars, 12/16/2025 - 12:59:01, Lot 1 - Mortar — Determination Of Tensile Strength, Lot 1 - Determination Of Potential Tensile Adhesion Strength, Lot 1 - Guardrail Test, Lot 1 - Glass – Thickness Test, Lot 1 - Suspended Load Test On Ceilings And Ceilings, Lot 1 - Roofing System - Hard Body And Concentrated Load Test On Roofs, Lot 1 - Flooring System - Verification Of The Resistance Of The Flooring System To Concentrated Vertical Loads, Lot 1 - Flooring System - Moisture Resistance In Wet And Wettable Areas (For 5 M²), Lot 1 - Hydrosanitary System - Hot Water And Cold Water Tightness Test, Lot 1 - Sewage And Rainwater System - Tightness Test, Lot 1 - Thermographic Inspection, Lot 1 - Complete Technical Report Level 1: Includes 1 To 3 Tests, Lot 1 - Complete Technical Report Level 2: Includes 4 To 6 Tests, Lot 1 - Complete Technical Report Level 3: Includes 7 To 9 Tests, Lot 1 - Complete Technical Report Level 4: Includes 10 To 15 Tests, Lot 1 - Complete Technical Report Level 5: Includes 16 Or More Tests, Lot 2 - Hydrant Tightness Test, Lot 2 - Functioning Test Of The Hydrant Motor Pump Set, Lot 2 - Hydrant Functioning Test - Pressure, Lot 2 - Hydrostatic Fire Hose Test, Lot 2 - Operational Test Of The Automatic Shower System (Sprinkler), Lot 2 - Spda Test (Discharge Protection System Atmospheric), Grounding And Electrical Continuity, Lot 2 - Visual Inspection Test Of Spda (Atmospheric Discharge Protection System), Lot 2 - Fire Alarm And Detection System Test, Lot 2 - Luminosity, Lighting And Emergency Signaling Test, Lot 2 - Electrical Conductivity Test, Lot 2 - Tensile Test Of The Cable Anchoring Device (Anchor Strap), Lot 2 - Test Of The Gas System (Lpg Or Gn), Lot 2 - Complete Technical Report Level 1: Includes 1 To 3 Tests, Lot 2 - Complete Technical Report Level 2: Includes 4 To 6 Tests, Lot 2 - Technical Report Complete Level 3: Includes 7 To 9 Tests, Lot 2 - Complete Technical Report Level 4: Includes 10 Or More Tests, Lot 3 - Insulation Test Of Low Voltage Electrical Installations, Lot 3 - Continuity Test Of Protection Detectors, Lot 3 - Insulation Resistance Test Of Installation Parts Selv, Pelv Or Electrical Separation Object, Lot 3 - Grounding Test, Lot 3 - Operating Voltage Test, Lot 3 - Load Test Test, Lot 3 - Sensitivity Test Test Of Protection Devices, Lot 3 - Test Test Of Command And Control Devices, Lot 3 - Protection Test By Equipotentialization And Sectioning Automatic Feeding, Lot 3 - Complete Technical Report Level 1: Includes 1 To 3 Tests, Lot 3 - Complete Technical Report Level 2: Includes 4 To 6 Tests, Lot 3 - Complete Technical Report Level
|