|
Tender For Civil Work , Earth Work Excavation For Foundation In All Classes Of Soils And Subsoils To Full Depth, As May Be Directed Except In Hard Rock, Requiring Blasting Including Initial Leads And Lifts And Refilling The Sides Of Foundation With Excavated Earth In 150Mm Layers Well Watered Rammed And Consolidated Including Depositing Surplus Earth With In The Godown Or Inside Compound In Places Shown With Initial Leads And Lifts, Clearing, Leveling Site, Shoring, Strutting, Baling Of Water Wherever Necessary Etc., Complete Complying With Standard Specification And As Directed. , Cement Concrete 1:5:10(One Cement, Five Sand And Ten Aggregate)Using 40Mm Gauge Hard Broken Granite Stone Jelly For Foundation Including De-Watering, Side Shuttering , Strutting, Wherever Necessary Including Curing Etc., Complete Complying With Standard Specifications And As Directed. , Providing And Laying In Position, Standardised Concrete Mix M20 Grade In Accordance With Is:456-200 Using 20Mm And Down Graded Hard Broken Granite Stone Jelly For All Reinforced Cement Concrete Items Of Works With Minimum Cement Content Of 325 Kg/M3 And Mazimum Water Cement Ratio Of 0.55, Including Admixture (Plasticiser / Super Plasticiser) In Recommended Proportions As Per Is:9103 To Accelerate, Retard Setting Of Concrete, Improvement Workability Without Impairing Strength And Durability With About (5 Cu.M) 7730 Kg Of 20Mm Machine Crushed Stone Jelly And With About (3.3 Cum)5156 Kg Of 10-12Mm Machine Crushed Stone Jelly And With About (4.7 Cum) 7670 Kg Of Sand, But Excluding Cost Of Reinforcement Gril And Fabricating Charges, Centering And Shuttering And Also Including Laying, Vibrating With Mechanical Vibrators, Finishing, Cutting Etc., And Providing Fixtures Like Fan Clams In The Reinforced Cement Concrete Floor/ Roof Slabs Wherever Necessary Without Claiming Extra Etc., Complete Complying With Standard Specfication And As Directed The Departmental Officers. The Coarse And Five Aggregates To Be Used Should Comply With The Requirements Of 15 Standards. (No Separate Payment Will Be Made By The Department For The Excess Usage Of Materials. In Foundation Basement. , In Ground Floor Upto 4.50M Height Above Basement , Providing Form Work For Centering The Soffits Of All Reinforcement Concrete Work Including Strutting To The Required (3 Metre) Height With Mild-Steel Sheets Of Size 90Cmx60cm 10 Gauge Stiffened With Welded Mild Steel Angles Of Size 25Mmx25mmx3mm Laid With Country Wood Joist Of Average Of Size 10Cmx6.50Cm At About 90Cm Centres With Casurina Props Of 13Cm Dia At 75Cm Centre To Centre With All Nails Coir, Wedges Complete And Removing The Form Work After Necessary Curing Period As Directed By The Corporations Officers. The Rates Should Inclusives Of Cutting , Bending, Welding , Charges Of M.S Sheets, M.S. Angles Etc., Complete Column Footing, Plinth Beam , Top Tie Beam Etc., , Slab, Beam, Lintel, Etc., , Square Column, Rectangular Column Or Round, Sunshade Etc., , Supplying, Fabricating And Placing In Position Ms/Rts Grills For Reinforcement For All R.C.C.Works Including Cost Of Steel, Labour For Straightening, Bending, Cranking, Tying Grills With 18 Gauge Galvanized Binding Wire And Placing Grills In Position Complete Complying With Standard Specification And As Directed. In Foundation And Basement , In Ground Floor Upto 4.50M Height Above Basement. , Brick Work In Cement Mortor 1:5(One Cement, Five Sand) Using Best Quality Country Bricks Of Size 8 3/4X4 ¼ X 2 ¾ For Walls Including Cost Of Scaffolding Curing, Finishing Etc., Complete Complying With Standard Specification And As Directed By The Departmental Officers. In Ground Floor Upto 4.50M Height Above Basement. , Plastering With Cement Mortor 1:5 (One Cement And Five Sand) 12Mm Thick Including Cost Of Scaffolding, Finishing, Curing Etc., Complete Complying With Standard Specification And As Directed. , Colour Washing Two Coats Over One Coat Of White Washing Using Best Shell Lime Including Cost Of Gum, Kanjee , Brushes Colouring Pigment Approved By The Officer And Finishing Complete Complying With Standard Specification And As Directed. , Dismantling Repair Renovation Masonry In Cement Mortar Walls Under 3M Height And Clearing Away And Carefully Stacking Materials Useful For Re-Use As Directed By The Departmental Officers. , Cutting And Levelling The Earth By Using Jcb Including Removing Of Slushy Earth Away From The Site As Directed By The Departmental Officers.
|