Glazing Work - Altdorf Community: Extension Of The Primary School - Trade: Aluminum-Glass Facade / Sun Protection. In View Of The Legal Right To A Mandatory All-Day Primary School From 2026, The Municipality Of Altdorf Is Planning To Expand The Primary School In Altdorf Into An Open All-Day School. The School Is Currently Designed As A Single Class, With An Average Of 20 Students Per Year. The Extension, Which Does Not Have A Basement, Consists Of 2 Additional Classrooms, A Cafeteria With A Kitchen And A Single-Field Sports Hall, Is To Be Built In Solid Concrete Construction With Steel Supports And Steel Beams, As Well As Masonry. The Roof Structure Of The Sports Hall Is Planned With A Trapezoidal Sheet Metal Shell On Laminated Wood Beams, And The Roof Structure Of The Cafeteria Is Planned With Cross-Laminated Timber Elements. The Classroom Extension Section Is Structurally Designed In Such A Way That A Later Addition Is Easily Possible. The Lean-To Roof Is Constructed Using Carpenter-Made Wooden Trusses And A Metal Roof Covering. The Remaining Flat Roofs Will Have A Bituminous Roof Seal With Green Roofs And A Pv System Installed On Top. Connection Work Is Required At The Transition To The Existing Building In Order To Connect The Old Building With The Extensions. The Parents Consultation Room And The Student Library In The Existing Building On The Ground Floor Will Be Dismantled And These Will Be Refitted In The Classroom Extension. The Fitted Kitchen In The Parents Conference Room Will Be Moved To The Course Room In The Existing Building And Reconnected There. Instead Of The Best. A Centrally Located Toilet Facility Will Be Installed In The Student Library. In Order To Make The School Accessible To Disabled People, The Best. A Wheelchair Lift Will Be Installed In The Auditorium. On The Upper Floor (Teachers And Administration Wing), Various Windows Have To Be Removed And The Parapets Have To Be Raised And New Windows Installed. The Best. The Gas Heating System In The Basement Of The Existing Building Will Be Dismantled And The Existing Building Will Be Connected To The New Heating System In The New Building. The Plan Is Currently To Complete The Construction Project In One Go, So That Full-Day Operation Will Be Possible From September 2027. In Order Not To Jeopardize The Funding Granted, The Amount Of Funding Must Be Installed And Accounted For By July 31, 2027!
Contact Information
Address
Spitalhof 1
Contact No.
071186040674
Email
altdorf-grundschule@menoldbezler.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 106317853
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.