Tender For 02 No. estimate (Providing additional 1x25 KVA DTR at village Raychandra Ka pura, orethi under Rajodha D/C AND village Budhara under Porsa D/C in (OandM) Dn. Amba- 1 : C-1.2 Material (ERP NO- 282124 2 11 KV Pin Insulator Polymer Composit (5 KN) 3 Erection Cost Of 11 KV Pin Insulator Polymer Composit (5 KN) 4 11 KV Strain hardware (T&C type) fittings 5 11 KV(45KN) Composite Polymer Disc Insulators 6 Fixing of Disc Insulator with H/ W 11 KV side 7 140 Kg.,8.0 Mtrs. long PCC pole 8 Labour charge for erection of 140 Kg.,8.0 Mtrs. long PCC pole (Erection charge @60%+Transportation charge@40%) 9 AAAC Raccoon conductor 0.075 sq. inch (80 sq.mm. Al.Eq.) 10 Erection cost of AAAC Raccoon conductor 0.075 sq. inch (80 sq.mm. Al.Eq.) 11 11 KV Single pole cut point fitting 100x50x6 mm channel 12 Erection cost of 11 KV Single pole cut point fitting 100x50x6 mm channel 13 11 KV Top clamp 65X65X6 mm. angle type 14 11 KV V cross arm 65X65X6 mm. angle type 15 Fixing of 11 KV V-cross arm with Top Clamp 16 Aluminium Binding wire and tape 17 Aluminium paint 18 Erection cost of Aluminium paint 19 Anti climbing devices ( Barbed wire 2.24 mm dia, 14 SWG) 20 Erection cost of Anti climbing Device (Barbed Wire) GS 2.24 mm Dia (14 SWG) 21 Back Clamp for 140 Kg PCC Pole MS Flat 50x6 mm 22 Back filling of poles with boulders. 23 Clamp for 140 Kg PCC Pole MS Flat 50x6 mm 24 Concreting of stay (16 mm / 12 mm) @ 0.2 Cmt. per stay 25 Erection cost of Concreting of stay (16 mm / 12 mm) @ 0.2 Cmt. per stay 26 Danger Boards Enamelled 11 KV 27 Eretion cost of Danger Boards Enamelled 11 KV 28 Earthing Coil of 115 Turns of 50 MM.Dia and 2.5 Mtr. Lead of 4.0 MM G.I Wire 29 G.I. WIRES 4.0 MM. (8 SWG) 30 Jointing Sleeves suitable for Rabbit (55Sq.mm.Al. Eq. ) AAAC conductor 31 M.S.Nuts with Bolts 32 Red oxide paint 33 Stay Insulators 90X65mm 34 Stay set complete without Stay wire 16 mm. (Painted) 35 Labour for Stay set complete without Stay wire 16 mm. (Painted) 36 STAY WIRE 7/3.15 MM.(7/10 SWG) 37 Stone Block/Pre cast block for base pedding(450X450X75MM) 38 GST 18% 39 : D-2.1 Material (ERP NO- 282124 40 140 Kg.,8.0 Mtrs. long PCC pole 41 Labour charge for erection of 140 Kg.,8.0 Mtrs. long PCC pole (Erection charge @60%+Transportation charge@40%) 42 LT Aerial bunched XLPE Cable 3 X 25+ 1 X 16+ 1 X 25 sqmm with aluminium alloy Bare messenger wire 43 Erection cost of LT Aerial bunched XLPE Cable 3 X 25+ 1 X 16+ 1 X 25 sqmm with aluminium alloy Bare messenger wire 44 Back filling of poles with boulders. 45 Clamp for 140 Kg PCC Pole MS Flat 50x6 mm 46 Clamps for neutral for AB Cable 47 Concreting of stay (16 mm / 12 mm) @ 0.2 Cmt. per stay 48 Erection cost of Concreting of stay (16 mm / 12 mm) @ 0.2 Cmt. per stay 49 Earthing Coil of 115 Turns of 50 MM.Dia and 2.5 Mtr. Lead of 4.0 MM G.I Wire 50 Earthing for PCC Pole 4.00 mm-8 SWG G.I wire- 0.8 Kg, per pole 51 LT A B cable Suspension clamps (Galvanized) 52 Erection cost of LT A B cable Suspension clamps (Galvanized) 53 LT A.B Cable tension clamps (Galvanized) 54 Erection cost of LT A.B Cable tension clamps (Galvanized) 55 M.S.Nuts with Bolts 56 Piercing connector Type-I for single/three phase (Main 16-50 sqmm tap-off 16-50 sqmm) 57 Piercing connector Type-II (Main 16-50 sqmm tap-off 16-50 sqmm) 58 Single Phase Service connection box (Deep Drwan Metal Service Connection Boxes )with one incoming up to 25 mm2 and 8 no outgoing up to 10 mm2 with insulated multiple outgoing connector- 59 Erection cost of Single Phase Service connection box (Deep Drwan Metal Service Connection Boxes )with one incoming up to 25 mm2 and 8 no outgoing up to 10 mm2 with insulated multiple outgoing connector- 60 Stay Insulators 90X65mm 61 Stay set complete without Stay wire 16 mm. (Painted) 62 Erection cost of Stay set complete without Stay wire 16 mm. (Painted) 63 STAY WIRE 7/3.15 MM.(7/10 SWG) 64 Stone Block/Pre cast block for base pedding(450X450X75MM) 65 GST 18% 66 : E-1.1 Material : 1x25 KVA DTR ( ERP NO- 282124 67 11 KV D.O. Fuse Unit Polymer type 68 Erection cost of 11 KV D.O. Fuse Unit Polymer type 69 11 KV Strain hardware (T&C type) fittings 70 11 KV(45KN) Composite Polymer Disc Insulators 71 Fixing of Disc Insulator with H/ W 11 KV side 72 11/0.4 KV Distribution transformer 25 KVA (Conventional) (Aluminium wound)(Rep-BGP) 73 Handling & Installation of Distribution Transformer (DTR) on DP, tightening with turn buckles on both sides, poles clamping and bolting of base jumpering on HT side 74 140 Kg.,8.0 Mtrs. long PCC pole 75 Labour charge for erection of 140 Kg.,8.0 Mtrs. long PCC pole (Erection charge @60%+Transportation charge@40%) 76 9 KV Gapless type ( 5KA) Polymer for DTR 77 Erection cost of 9 KV Gapless type ( 5KA) Polymer for DTR 78 AAAC Rabbit conductor 0.05 sq. inch. (55 sq.mm. Al.Eq.) 79 XLPE Cable 1 core unarmoured 35 sqmm Aluminium conductor 1100 Volts 80 XLPE Cable 1 core unarmoured 70 sqmm Aluminium conductor 1100 Volts 81 Aluminium paint 82 Erection cost of Aluminium paint 83 Anti climbing devices ( Barbed wire 2.24 mm dia, 14 SWG) 84 Erection cost of Anti climbing Device (Barbed Wire) GS 2.24 mm Dia (14 SWG) 85 Back Clamp for 140 Kg PCC Pole MS Flat 50x6 mm 86 Bi-metallic clamps Distribution Transformers Bushing 87 Bi-metallic clamps suitable for 12mm dia stud and 80sqmm AAAC 88 Category: D3: Three Phase LT-CT operated Smart Meter- DT Meter with 89 Erection cost of Category: D3: Three Phase LT-CT operated Smart Meter- DT Meter with 90 Clamp for 140 Kg PCC Pole MS Flat 50x6 mm 91 Concreting of stay (16 mm / 12 mm) @ 0.2 Cmt. per stay 92 Erection cost of Concreting of stay (16 mm / 12 mm) @ 0.2 Cmt. per stay 93 Concreting of structures & foundation (1:3:6) 94 Erection cost of Concreting of structures & foundation (1:3:6) 95 D.C. Cross-arms 8 ft centre to center (100x50x6mm) Channel 96 Erection cost of D.C. Cross-arms 8 ft centre to center (100x50x6mm) Channel 97 D.O.Mounting Channel 75x40x6mm 98 Erection cost of D.O.Mounting Channel 75x40x6mm 99 Danger Boards Enamelled 11 KV 100 Erection cost of Danger Boards Enamelled 11 KV 101 EARTHING SET (40MM , 3 METER GI PIPE , GI WIRE, EARTHING CLMAP AND NUT BOLT) 102 LT Robust Fuse Unit 103 M.S.Nuts with Bolts 104 Red oxide paint 105 Erection cost of Red oxide paint 106 Stay Insulators 90X65mm 107 Stay set complete without Stay wire 16 mm. (Painted) 108 Erection cost of Stay set complete without Stay wire 16 mm. (Painted) 109 STAY WIRE 7/3.15 MM.(7/10 SWG) 110 Stone Block/Pre cast block for base pedding(450X450X75MM) 111 Trans. Belting with 50 X 50 X 6 mm.angle with two cross fixing channels 112 Transformer mounting Channel (100X50x6 mm.) 113 Erection cost of Transformer mounting Channel (100X50x6 mm.) 114 GST 18% 115 C-1.2 Material (ERP NO- 282341 116 11 KV AL 59 ACS Covered Conductor 78.82 sq.mm along with MVCC accessories as per EN:50397 Calculated for 1 KM Single Phase Feeder, tension/dead/anchoring clamps with piercing connector suitable for MVCC, IPC for CC to CC connection,EN-50397 -P-2 117 Erection cost of 11 KV AL 59 ACS Covered Conductor 78.82 sq.mm along with MVCC accessories as per EN:50397 Calculated for 1 KM Single Phase Feeder, tension/dead/anchoring clamps with piercing connector suitable for MVCC, IPC for CC to CC connection,EN-50397 -P-2 118 11 KV Pin Insulator Polymer Composit (5 KN) 119 Erection Cost Of 11 KV Pin Insulator Polymer Composit (5 KN) 120 11 KV Strain hardware (T&C type) fittings 121 11 KV(45KN) Composite Polymer Disc Insulators 122 Fixing of Disc Insulator with H/ W 11 KV side 123 140 Kg.,8.0 Mtrs. long PCC pole 124 Labour charge for erection of 140 Kg.,8.0 Mtrs. long PCC pole (Erection charge @60%+Transportation charge@40%) 125 AAAC Raccoon conductor 0.075 sq. inch (80 sq.mm. Al.Eq.) 126 Erection cost of AAAC Raccoon conductor 0.075 sq. inch (80 sq.mm. Al.Eq.) 127 H-Beams 152 X 152 mm., 37.1 Kg./Mtr.-13 mtr. Long = 482.3 kg 128 Erection cost of material with transportation for H-Beams 152 X 152 mm., 37.1 Kg./Mtr.-13 mtr. Long = 482.3 kg 129 11 KV Single pole cut point fitting 100x50x6 mm channel 130 Erection cost of 11 KV Single pole cut point fitting 100x50x6 mm channel 131 11 KV Top clamp 65X65X6 mm. angle type 132 11 KV V cross arm 65X65X6 mm. angle type 133 Fixing of 11 KV V-cross arm with Top Clamp 134 Aluminium Binding wire and tape 135 Aluminium paint 136 Erection cost of Aluminium paint 137 Anti climbing devices ( Barbed wire 2.24 mm dia, 14 SWG) 138 Erection cost of Anti climbing Device (Barbed Wire) GS 2.24 mm Dia (14 SWG) 139 Back Clamp for 140 Kg PCC Pole MS Flat 50x6 mm 140 Back Clamps for H-Beam of MS Flat 65x8mm (Each weight 1.92 Kg) 141 Back filling of poles with boulders. 142 Clamp for 140 Kg PCC Pole MS Flat 50x6 mm 143 Clamp 65X8 mm Flat of MS Flat for H-Beam ( Each weight 3.2 kg) 144 Concreting of stay (16 mm / 12 mm) @ 0.2 Cmt. per stay 145 Erection cost of Concreting of stay (16 mm / 12 mm) @ 0.2 Cmt. per stay 146 Concreting of structures & foundation (1:3:6) 147 Erection cost of Concreting of structures & foundation (1:3:6) 148 Danger Boards Enamelled 11 KV 149 Erection cost of Danger Boards Enamelled 11 KV 150 Earthing Coil of 115 Turns of 50 MM.Dia and 2.5 Mtr. Lead of 4.0 MM G.I Wire 151 G.I. WIRES 4.0 MM. (8 SWG) 152 Jointing Sleeves suitable for Rabbit (55Sq.mm.Al. Eq. ) AAAC conductor 153 M.S.Nuts with Bolts 154 Red oxide paint 155 Erection cost of Red oxide paint 156 Stay Insulators 90X65mm 157 Stay set complete without Stay wire 16 mm. (Painted) 158 Erection cost of Stay set complete without Stay wire 16 mm. (Painted) 159 STAY WIRE 7/3.15 MM.(7/10 SWG) 160 Stone Block/Pre cast block for base pedding(450X450X75MM) 161 GST 18% 162 : D-2.1 Material (ERP NO- 282341 163 140 Kg.,8.0 Mtrs. long PCC pole 164 Labour charge for erection of 140 Kg.,8.0 Mtrs. long PCC pole (Erection charge @60%+Transportation charge@40%) 165 LT Aerial bunched XLPE Cable 3 X 25+ 1 X 16+ 1 X 25 sqmm with aluminium alloy Bare messenger wire 166 Erection cost of LT Aerial bunched XLPE Cable 3 X 25+ 1 X 16+ 1 X 25 sqmm with aluminium alloy Bare messenger wire 167 Back filling of poles with boulders. 168 Clamp for 140 Kg PCC Pole MS Flat 50x6 mm 169 Clamps for neutral for AB Cable 170 Concreting of stay (16 mm / 12 mm) @ 0.2 Cmt. per stay 171 Erection cost of Concreting of stay (16 mm / 12 mm) @ 0.2 Cmt. per stay 172 Earthing Coil of 115 Turns of 50 MM.Dia and 2.5 Mtr. Lead of 4.0 MM G.I Wire 173 Earthing for PCC Pole 4.00 mm-8 SWG G.I wire- 0.8 Kg, per pole 174 LT A B cable Suspension clamps (Galvanized) 175 Erection cost of LT A B cable Suspension clamps (Galvanized) 176 LT A.B Cable tension clamps (Galvanized) 177 Erection cost of LT A.B Cable tension clamps (Galvanized) 178 M.S.Nuts with Bolts 179 Piercing connector Type-I for single/three phase (Main 16-50 sqmm tap-off 16-50 sqmm) 180 Piercing connector Type-II (Main 16-50 sqmm tap-off 16-50 sqmm) 181 Single Phase Service connection box (Deep Drwan Metal Service Connection Boxes )with one incoming up to 25 mm2 and 8 no outgoing up to 10 mm2 with insulated multiple outgoing connector- 182 Erection cost of Single Phase Service connection box (Deep Drwan Metal Service Connection Boxes )with one incoming up to 25 mm2 and 8 no outgoing up to 10 mm2 with insulated multiple outgoing connector- 183 Stay Insulators 90X65mm 184 Stay set complete without Stay wire 16 mm. (Painted) 185 Erection cost of Stay set complete without Stay wire 16 mm. (Painted) 186 STAY WIRE 7/3.15 MM.(7/10 SWG) 187 Stone Block/Pre cast block for base pedding(450X450X75MM) 188 GST 18% 189 : E-1.1 Material : 1x25 KVA DTR ( ERP NO- 282341 190 11 KV D.O. Fuse Unit Polymer type 191 Erection cost of 11 KV D.O. Fuse Unit Polymer type 192 11 KV Strain hardware (T&C type) fittings 193 11 KV(45KN) Composite Polymer Disc Insulators 194 Fixing of Disc Insulator with H/ W 11 KV side 195 11/0.4 KV Distribution transformer 25 KVA (Conventional) (Aluminium wound)(Rep-BGP) 196 Handling & Installation of Distribution Transformer (DTR) on DP, tightening with turn buckles on both sides, poles clamping and bolting of base jumpering on HT side 197 140 Kg.,8.0 Mtrs. long PCC pole 198 Labour charge for erection of 140 Kg.,8.0 Mtrs. long PCC pole (Erection charge @60%+Transportation charge@40%) 199 9 KV Gapless type ( 5KA) Polymer for DTR 200 Erection cost of 9 KV Gapless type ( 5KA) Polymer for DTR 201 AAAC Rabbit conductor 0.05 sq. inch. (55 sq.mm. Al.Eq.) 202 XLPE Cable 1 core unarmoured 35 sqmm Aluminium conductor 1100 Volts 203 XLPE Cable 1 core unarmoured 70 sqmm Aluminium conductor 1100 Volts 204 Aluminium paint 205 Erection cost of Aluminium paint 206 Anti climbing devices ( Barbed wire 2.24 mm dia, 14 SWG) 207 Erection cost of Anti climbing Device (Barbed Wire) GS 2.24 mm Dia (14 SWG) 208 Back Clamp for 140 Kg PCC Pole MS Flat 50x6 mm 209 Bi-metallic clamps Distribution Transformers Bushing 210 Bi-metallic clamps suitable for 12mm dia stud and 80sqmm AAAC 211 Category: D3: Three Phase LT-CT operated Smart Meter- DT Meter with 212 Erection cost of Category: D3: Three Phase LT-CT operated Smart Meter- DT Meter with 213 Clamp for 140 Kg PCC Pole MS Flat 50x6 mm 214 Concreting of stay (16 mm / 12 mm) @ 0.2 Cmt. per stay 215 Erection cost of Concreting of stay (16 mm / 12 mm) @ 0.2 Cmt. per stay 216 Concreting of structures & foundation (1:3:6) 217 Erection cost of Concreting of structures & foundation (1:3:6) 218 D.C. Cross-arms 8 ft centre to center (100x50x6mm) Channel 219 Erection cost of D.C. Cross-arms 8 ft centre to center (100x50x6mm) Channel 220 D.O.Mounting Channel 75x40x6mm 221 Erection cost of D.O.Mounting Channel 75x40x6mm 222 Danger Boards Enamelled 11 KV 223 Erection cost of Danger Boards Enamelled 11 KV 224 EARTHING SET (40MM , 3 METER GI PIPE , GI WIRE, EARTHING CLMAP AND NUT BOLT) 225 LT Robust Fuse Unit 226 M.S.Nuts with Bolts 227 Red oxide paint 228 Erection cost of Red oxide paint 229 Stay Insulators 90X65mm 230 Stay set complete without Stay wire 16 mm. (Painted) 231 Erection cost of Stay set complete without Stay wire 16 mm. (Painted) 232 STAY WIRE 7/3.15 MM.(7/10 SWG) 233 Stone Block/Pre cast block for base pedding(450X450X75MM) 234 Trans. Belting with 50 X 50 X 6 mm.angle with two cross fixing channels 235 Transformer mounting Channel (100X50x6 mm.) 236 Erection cost of Transformer mounting Channel (100X50x6 mm.) 237 GST 18% Please Enable Macros to View BoQ information
|