|
Lot 1 - Priming With Diluted Asphalt, Lot 1 - Acquisition Of Diluted Asphalt Cm-30, Lot 1 - Bonding Painting, Lot 1 - Acquisition Of Rr-2C Asphalt Emulsion - Acquisition Of Rr-2C Asphalt Emulsion, Lot 1 - Transport Of Dmt Emulsions 65 Km - Transport Of Dmt Emulsions 65 Km, 12/12/2025 - 16:23:52, Lot 1 - Regularization And Compaction Of The Subgrade, Lot 1 - Macadam Sub-Base 17 Cm, Lot 1 - Macadam Transport (Dmt=32 Km), Lot 1 - Loading, Maneuvering And Unloading Macadam, Lot 1 - Graded Crushed Stone Base 15Cm, Lot 1 - Base Transport (Dmt=32 Km), Maneuvering And Unloading Of Graded Crushed - Loading, Maneuvering And Unloading Of Graded Crushed, Lot 1 - Asphalt Concrete - Range C - (Without Commercial Mass) - Asphalt Concrete - Range C - (Without Commercial Mass), Lot 1 - Supply Of Asphalt Concrete - Range C - (Commercial Mass), Lot 1 - Acquisition Of Cap 50/70 For Asphalt Concrete - Acquisition Of Cap 50/70 For Asphalt Concrete, Lot 1 - Transport Of Cbuq (Dmt=30 Km), Maneuvering And Unloading Of Cbuq, Lot 1 - Transport Of Asphalt Mat - Truck With Cap Of 20 Ton - Rod. Pavim. (Dmt=60 - Transport Of Asphalt Mat. - Truck With 20 Ton Cap. - Paving Rod. (Dmt=60 Km), Lot 1 - Excavation, Loading And Transport Of 1St Category Material - Dmt 200 To 400 M - P - Excavation, Loading And Transport Of 1St Category Material - Dmt 200 To 400 M - For Reuse, Loading And Transport Of 1St Category Material - Dmt 400 To 600 M - P - Excavation, Loading And Transport Of 1St Category Material - Dmt 400 To 600 M - To Bota-Fora, Lot 1 - Transport Of Excavated Material To Bota-Fora (Exceeding 600 M), Lot 1 - Spreading Of Material In Bota-Fora, Lot 1 - Compaction Of Landfills At 100% Intermediate Proctor, Loading And Transport Of Soft Soils - Dmt 400 To 600 M, Lot 1 - Reinforcement Of The Subgrade With Dry Macadam, Lot 1 - Transport Of Macadam (Dmt 32 Km), Lot 1 - Mobilization And Demobilization Of Equipment, Lot 1 - Local Administration Of The Work, Lot 1 - Implementation Of Construction Sign, Lot 1 - Rental Of Container 2, 30 Mobile Metal, Side 1.00 M, 1 Implementation And 1 Removal Daily, Lot 1 - Plastic Cone For Traffic Channeling - Use Of 150 Cycles - Plastic Cone For Traffic Channeling - Use Of 150 Cycles - Supply - 1 Implementation And 1 Removal Per Day, Lot 1 - Directing Device Or Plastic Screen Type Lock - Plastic Screen Type Directing Or Blocking Device With Fixed Support - Use Of 150 Cycles - Supply, 01 Plastic Screen Type Directing Or Blocking Device With Mobile Support Affixed To A Concrete Block - Use Of 150 Cycles - Supply, 01 Implementation And 01 Daily Removal Implementation And 01 Removal Daily Rate, Lot 1 - Cleaning And Deforestation Of Blocks, Lot 1 - Transport Of Cleaning Material To Bota Fora - Dmt = 7 Km - Transport Of Cleaning Material To Bota Fora - Dmt = Km, Lot 1 - Cutting Tree With A Diameter Of 0.40 M To 0.60 M - Transport Of Excavated Material To Bota-Fora (Exceeding 600 M), Lot 1 - Removal Of Remaining Roots From A Tree Trunk With A Diameter Greater Than U Equal To - Removal Of Remaining Roots From A Tree Trunk With A Diameter Of 0.60 M, Lot 1 - Mechanical Excavation Of A Trench In 1St Category Material, Lot 1 - Backfill
|