|
Architectural, Construction, Engineering And Inspection Services – Complete Mission Of Project Author In A Multidisciplinary Team For The Renovation And Transformation Project Of The F & G Buildings Of The Usuqare.Brussels Site. I.5.1 Presentation And Scope Of The Mission The Purpose Of The Contract Is A Dual Mission As Project Author For The F&G Building Renovation Project. The Mission Of The Project Author Includes All The Services Of The 2 Main Components: Component 1 – Complete Mission - Developments “Helios Foundation Headquarters” And “Decarbonlab” [Ma1.1] Studies Of Architecture, Stability, Special Techniques, Coordination Of Studies, Coordination-Safety And Health, Environmental Expertise And Sustainable Including Peb Coordination, Acoustics, Execution Coordination And Budgetary Control To Enable Construction As A General Contractor. Space Planning Must Be Re-Evaluated. Part 2 – Partial Mission - Ulb/Vub University Developments [Ma2.1] Compliance Of Occupied Buildings (Fire, Electricity, Ventilation, Etc.) (See Appendix F_Programming), Stability Studies, Special Techniques, Coordination Of Studies, Coordination-Security And Health, Environmental And Sustainable Expertise Including Peb And Acoustics Coordination Until The Award Of The Market To The General Contractor (The Work Will Be Carried Out Via Contracts Framework Of Works Of The Ulb) The Author Of The Project Can Then Be Consulted From Time To Time For Specific Studies/Missions According To The Management Rate Shown Below In The Point “Remuneration And Fees” The Space Planning Is Already Defined And Must Not Be Re-Evaluated. The Complete Mission Includes: • The Preparatory Meetings; • The Establishment Of The Summary Preliminary Project (Aps), • The Establishment Of The Final Preliminary Project File (Apd), • The Establishment Of The Urban Planning Permit Or Planning And Environmental Permit (Mixed Project) Or Single Permit (Urban Planning – Heritage), Including The Peb Proposal, (Pu) • Assistance Of The Pa During The Procedures For Obtaining Permits, • The Drafting Of The Csc – Works And The Peb Technical File, • The Development Of A Building Information Model (Bim) By Means Of A Continuous And Structured Collaborative Process And In Connection With The Eir Bim In The Appendix, • The Establishment Of The “Project”-Competition File. (Dce), • The Coordination Of Studies And Procedures With The Various Distribution Companies As Part Of All The Connections To Be Made In The Buildings, • The Establishment Of The Reasoned Analysis Report For The Award Or Non-Award Of The Works Contract (Sou), • The Management And Control Of The Works (Exe), • Budgetary And Planning Control, • The Coordination/Planning Of Decisions, Authorizations, Permits, Study And Execution Tasks, Both Preparatory And On Site, Of All Stakeholders, Decision-Making Authorities, A.P., Advisors, Contractors, Suppliers, • Safety-Health Coordination, On The Basis Of The Law Of August 4, 1996 Relating To The Well-Being Of Workers During The Performance Of Their Work And The Royal Implementing Decrees Which Supplement It, Including In Particular The Royal Decree Of January 25, 2001 Relating
|