|
Local Administration Of The Work, Supply And Installation Of Work Sign, Mobilization / Demobilization Of Equipment, 12/12/2025 - 08:19:36, 12/12/2025 - 08:19:38, 12/12/2025 - 08:19:39, 12/12/2025 - 08:19:40, Temporary Construction Signage, Removal Of Cobblestones, Loading, Maneuvering And Unloading, Transport With Dump Truck, Transport, Excavation, Base And Sub-Base Construction, Execution, Removal, Resettlement, Removal And Resettlement, Mechanized Trench Excavation, Trench Excavation, Removal Of 3Rd Category Material, Preparation Of Trench Bottom, Concrete Pipe, Maneuvering And Unloading Of Concrete Pipes, Transport With Truck Body, Backfilling, Connection And Passage Box - Clp, Caixa Boca De Lobo, Supply, Cleaning, Painting, Machining Of Asphalt Concrete, Loading Of Asphalt Mix, Transport With Tank Truck, Asphalt, Asphalt Emulsion, Asphalt Cement, Strip Painting, Steel Plate, Reflective Tack, Painting, Content Test, Test, Application Rate Test, Aggregate Particle Size Test, Bitumen Percentage Test, In Situ Density Test, Marshall Test, Control Test
|