|
Lot 1 - Technical Report - Structural, Lot 1 - Technical Report - Vegetation Cover, Lot 1 - Technical Report - Hydrological Of Arruada Area, Lot 1 - Technical Report - Fauna, Lot 1 - Technical Report - Phytosociological, 12/12/2025 - 14:16:20, Lot 1 - Survey Building Registration - Photographic Report Included, Lot 1 - Registration With Laser Scan In Bim - Tour 360, With Facilities, Lot 1 - Budget, Lot 1 - Issuance Of Report With Art - Technical Report / Survey, Lot 1 - Mobilization And Demobilization Of Topography Team, Lot 1 - Topographic Survey Of Public Roads, With Registration Of Utility Networks, Lot 1 - Planialtimetric Topographic Survey, Lot 1 - Density And Specific Mass, Lot 1 - Direct Shear, Lot 1 - Liquidity And Plasticity, Lot 1 - Depth And Carbonation, Lot 1 - Resistivity, Lot 1 - Sclerometry, Lot 1 - Ultrasound, Lot 1 - Cbr (California Support Index), Lot 1 - Chloride Concentration, Lot 1 - Porosity, Lot 1 - Specimen Extraction And Compressive Strength Test, Lot 1 - Alkali-Aggregate Reaction, Lot 1 - Pacometry, Lot 1 - Corrosion Potential, Lot 1 - Soil Granulometry, Lot 1 - Simple Proctor, Lot 1 - Mobilization, Installation, Demobilization Of Probing Equipment And Report (Unit/Day), Lot 1 - Light Vehicle - 53 Kw, With Driver, Installation And Demobilization Of Drilling Equipment, Lot 1 - Travel Between Drilling Holes, Lot 1 - Percussion Sounding, Report Included, Lot 1 - Auger Sounding, Lot 1 - Full Architect With Additional Charges, Lot 1 - Building Technician With Additional Charges
|