Sanitary Fixture Installation Work – Lot N008 Heating And Plumbing - Culture/Monastery/Kyritz. Sanitary: Approx. 180M Sewage Pipe Dn50-Dn125 2X Lifting System Above Ground 20 Objects On The Pre-Wall 230M Drinking Water Pipe Dn12 - Dn32 Heating: Approx. 450M Pipes Dn15-Dn32 740M2 Underfloor Heating Incl. Distributors And Attachments 6X Distributors The Sanitary Objects Provided In The Area Of The Event Building Are Based On Quality And Visual Appearance Of The Sanitary Objects And Accessories Installed In The City Library. Hot Water Is Produced Decentrally Via Instantaneous Water Heaters. The Instantaneous Water Heaters Are Provided In An Electronically Controllable Version. A Connection Device For A Kitchen Sink (Cold Water) And Dishwasher Is Provided For The Lounge Counter. The Hot Water Is Supplied Via An Electric Flow Heater With A Nominal Output Of 13.5 Kw. The Kitchen Equipment, Including The Necessary Facilities For The Café, Should Be Provided By The Customer. A Connection Device For A Kitchen Sink (Cold Water) Is Provided For The Preparation/Teaching Materials Room. The Hot Water Is Supplied Via An Electric Flow Heater With A Nominal Output Of 13.5 Kw. The Kitchen Equipment, Including The Necessary Facilities, Should Be Provided By The Customer. Heating Technology: The Heat Is Generated In The Existing Library Building And Is Led To The Exam Wing Via Underground Pipes. The Entire Area Of The Event Building Is Heated Using Underfloor Heating. Where Visible, The Distribution Cabinets Are Intended For Wall Mounting. Use Of Uniform Materials For The Ensemble: From A Design Perspective, It Is Of Central Importance For The Cultural Ensemble That The Individual Buildings - Both Of Historical Origin And Newly Added - Develop A Common Material And Design Language. The Planned Mineral Coverings Contribute Significantly To The Atmospheric Effect Of The Ensemble, Particularly In Terms Of Color, Surface Feel, Lighting Effect And Handcrafted Texture. In Order To Strengthen The Perception Of The Cultural Monastery As A Coherent, High-Quality And Identity-Forming Place, The Use Of Uniform Materials Is Therefore Essential. The Continuous Implementation Of The Material Qualities Already Implemented In The City Library Ensures That All Buildings Have A Coherent Design Expressiveness And Fit Coherently Into Both The Historical Context And The Overall Image Of The Ensemble. Overall Measure: The Planned Construction Measure Involves The Construction Of A New Event Building With Connectors. At The Same Time, In Addition To The New Building, The Retreat Wing Of The Former Monastery (Existing Building) Is Being Converted Into A Museum. The Building Plot Is Located In Kyritz In The Old Town Kyritz Monument Area And The Old Town Kyritz Ground Monument. The Underfloor Heating Should Be Controlled Room By Room Using Appropriate Room Temperature Controllers. The Underfloor Heating Circuits Are Balanced Via The Distributor Of The Respective Zone.
Contact Information
Address
Marktplatz 1
Contact No.
+49 33971-85225
Email
vergabe@kyritz.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 106177736
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.