|
1. As Part Of The Investment Task, Construction Works Related To The Thermal Modernization Of The Building Of Primary School No. 2 Should Be Performed As Part Of The Investment Task, E.G.: Thermal Modernization Of The Building Of Primary School No. 2 In Ostrów Wielkopolski - Thermal Modernization Of Historic Public Buildings In Ostrów Wielkopolski, Including, Among Others: - Replacement Of Window Joinery, - Demolition, Preparatory And Reconstruction Works, - Insulation Thermal Insulation Of The Ceiling Above The Attic, - Installation Of Led Lighting, - Installation Of An Above-Ground Water Tank For Collecting Rainwater From The Roof Of The Building, - Replacement Of Thermostatic Valves With New P1 Valves With Setting Lock, - Identification Of Classrooms And Other Rooms For Blind And Visually Impaired People By Equipping Them With Information Signs In Braille. Place Of Work: Ostrów Wielkopolski, Ul 51, Plot No. 20/2, Section 0081.3. The Subject Of The Order Is Described In The Following Documents: 1) Description Of The Subject Of The Order - Annex No. 9, 2) Construction Design - Annex No. 10, 3) Technical Design - Electrical Installations - Annex No. 11, 4) Specification - Above-Ground Rainwater Tank - Annex No. 12, 5) Energy Audit - Annex No. 13, 6) Audit Lighting - Annex No. 14.7) Technical Specifications For The Execution And Acceptance Of Works - Construction Industry - Annex No. 15.8) Technical Specifications For The Execution And Acceptance Of Works - Electrical Industry - Annex No. 16.9) Permit No. 41/2024/A - Annex No. 17.10) Pr _ Primary School No. 2_Ostrów Wlkp.Pdf - Annex No. 18.11) Pr _Primary School No. 2_ Ostrów Wielkopolski - Annex No. 19. Attention! The Bills Of Quantities Are For Auxiliary Purposes Only. Bearing In Mind That In This Procedure A Lump Sum Price For The Execution Of The Subject Of The Order Was Adopted, The Contractor Will Prepare An Offer Only On The Basis Of The Description Of The Subject Of The Order, The Construction Design, The Technical Design, The Energy Audit, The Lighting Audit, The Technical Specifications For The Execution And Acceptance Of The Works, And The Permit. - Constituting Annexes To The Swz.4. Other Requirements And Comments.4.1. During The Period Of Carrying Out The Works, The Contractor Will Be Insured Against Civil Liability For The Activities Related To The Subject Of The Contract For An Amount Not Less Than Pln 100,000.00.4.2. The Contractor Will Be Liable For Defects In The Subject Of The Contract For A Period Of 3 Years, Counting From The Date Of Signing The Final Acceptance Report.4.3 5 Years From The Date Of Signing The Final Acceptance Report.4.4. The Ordering Party Requires The Contractor Or Any Subcontractor To Employ, On The Basis Of The Employment Relationship Referred To In Article 22 § 1 Of The Act Of June 26, 1974, The Labor Code: 1) Construction Works Consisting In The Performance Of Dismantling And Demolition Works, As Well As Assembly And Finishing Works, 2) Electrical Works I
|