1. The Subject Of The Order Is The Development Of Complete And Comprehensive Design Documentation For The Reconstruction Of The Building Of The Volunteer Fire Department (Osp) Leszno Gronowo, Located In Leszno At Ul. Gronowska 56, Along With Obtaining All Necessary Arrangements, Permits, Decisions And Authors Supervision During The Reconstruction Of The Building. 2.1. Description Of The Existing Condition: The Building Located At Ul. Gronowska 56 Is Used By The Volunteer Fire Department Leszno Gronowo, The Building Is Located At Ul. Gronowska 58 Is Used By Mok (Municipal Cultural Center), And Part Of It Conducts Commercial Activities. The Buildings Are Located On Plots 306301_1.0001.Ar_111.375/1, 376/1,375/2 And 376/2. 2.2. Assumptions For The Subject Of The Order: - Insulation Of The Building And Replacement Of Windows And Doors, If Necessary, While The Part Used By The Retail Outlet (Marked 2 In The Drawing) Will Not Be Rebuilt, - Modernization Of The Buildings Heating System And Domestic Hot Water Supply. In Consultation With The Employer, - Design Of Additional Garages For Fire Trucks In The Number Agreed With The Employer, - Design Of New Sanitary And Social Rooms With A Kitchenette, Cloakrooms, Utility And Office Rooms For The Volunteer Fire Department Along With Their Equipment, Laundry, Cylinder Charging Point, Dirty, Transitional And Clean Zones, - Development Of A Passage Between The Buildings As A New Room (Marked 4 In The Drawing), - Design Of A New Storage Room (Marked 4 In The Drawing 5), - Leveling Of Floor Levels In The Part Currently Used By The Volunteer Fire Department, - Demolition Of The Stage (Marked 1 In The Drawing), - Change Of Use Of The Auditorium (Marked 1 In The Drawing), - Second Entrance To The Fire Station (Currently The Fire Station Is Entered Through The Garage Gate), - Second Entrance To The Fire Station Area Located From The Side Of Ul. M. Kolbe, - Reconstruction Of The Power Supply Installation, Including Emergency Power Supply Provided By A Mobile Power Generator On A Trailer And Reserve Power Supply (For The Monitoring Network, Lan, Notification System) Provided By Ups, - Replacement Or Modernization Of Electrical, Water And Sewage Installations, - Installation Of Video Monitoring And Lan Network, - Modernization Of Cold Water And Hot Water Installations, - Integration With The Existing Notification System Used By The Volunteer Fire Department, - Reference To The Sewage System Telecommunications Network Of An External Telecommunications Operator. Other, More Detailed Requirements Regarding The Planned Investment Project, Which Should Be Included In The Design Documentation, Will Be Discussed With The Participation Of The Representative Of The Ordering Party And The Contractor In The Course Of Ongoing Coordination Between The Parties At The Stage Of Implementation Of This Task. 2.3. Ordering Partys Requirements: At Each Stage Of The Order Execution, The Contractor Should Submit: 1) Stage I: The Concept Of Reb
|