The Order Is For Construction And Includes The Following Construction And Assembly Works: Dismantling Of Wire 1Хасо 500 From Bus A (South Side) And Bus B, Including The Deviations To The Bus Disconnectors And The Apparatus Terminals For Them. Dismantling Of The Busbar In The Field Seslavtsi From Bus Disconnectors To Linear Disconnector, Including The Deviations To The Circuit Breaker And Apparatus Terminals For All Equipment In The Field. Supply And Installation Of Composite Conductor Type Aaas Or Equivalent With A Cross Section Of Approximately 996 Mm2 For Replacement Of The Southern Part Of A Bus And B Bus, Including The Taps To The Bus Disconnectors And Apparatus Terminals Therefor And The Tap From The Southern Part Of A Bus To The Connection Busbar With The Northern Part Of A Bus. Installation Of Spacers, 2 Pcs. For Each Tensile Field. The Spacers Are Supplied By The Client. Supply And Installation Of Composite Conductor Type Aaas Or Equivalent With A Cross-Section Of Approximately 996 Mm2 For Busbar Replacement In Seslavtsi Field From Bus Disconnectors To Line Disconnector, Including Branching To Circuit Breaker And Apparatus Terminals For All Equipment In The Field. Replacement Of All M20 Connecting Bolts On The Transom Column Connection Of The Bus Portals Affected By The Reconstruction With Galvanized M20 Of Strength 8.8. Replacement Of All M16 Tie-Bolts On The Transom Connection Of All Linear Portals With 8.8 Strength Galvanized M16 Bolts. The Term For Complete Execution Of The Order Is 105 Calendar Days, Including: - 60 Calendar Days For Preparatory Activities (Delivery Of Materials And Equipment), Counted From The Date Of Conclusion Of The Contract To The Date Of The Notification Letter To The Contracting Authority For Completed Preparatory Activities. - 45 Calendar Days For The Execution Of The Srm, Counted From The Date Of Signing The Protocol For The Opening Of The Construction Site, Until The Date Of The Notification Letter To The Contractor For Completed Srm. A Mandatory Condition For Participation In The Procedure Is The Inspection. For A Visit To The Site, A Written Request Is Submitted To The Contracting Authority Through The Centralized Electronic Platform For Public Procurement.
Contact Information
Contact Person
Десислава Лъчезарова Колева-Иванова
Contact No.
+35929691364
Email
Desislava.Koleva@sfg.eso.bg
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 106158971
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.