Type Of Servicenew Construction Of The Indeland Visitor Center On The Goltsteinkuppe Near Lucherberg, A Recultivated Waste Dump In The Immediate Vicinity Of The Future Indesee. The New Building At Indemann Is To Become A Visitor Center. In Front Of The Building, A Small Square Is Created Directly Under The Arm Of The Indemann, Which Guides The Flow Of Visitors Into The Building. The Building Develops As A Folded Architecture Made Of Roof Panels Into A Pyramid-Shaped Body, The Eaves Of Which Rest On The Ground All The Way Around. The Exception To This Is The Glass Facade Side With The Main Entrance Towards Indemann, Which Is Cut Out Of The Volume. One Of The Roof Areas Will Be Converted Into A Grandstand On An Embankment. The Construction Consists Of A Floor Slab On Strip Foundations As A Beam Grid And A Concrete Outer Wall Construction That Delimits The Earth Embankment. The Remaining Supporting Structure Consists Of Structural Wooden Elements In The Form Of Cross-Laminated Timber Ceiling Elements And Glued-Laminated Timber Walls, Columns And Beams.
Contact Information
Address
Rathausstraße 8
Contact No.
+49242884880
Email
milan@niederzier.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 106158839
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.