Installation Of Video Monitoring Cameras Video Monitoring Camera Installation Service, As Described In The Terms Of Reference And In Line With That Indicated By Parliamentary Amendment Number 401 For The Secretariat Of Mobility - Semob (Installation Of Cameras For Monitoring Public Squares And Leisure Areas In The Industrial Zone)., Support For Cameras On Steel Poles - Description: Support For Fixing Cameras Of Videomonitoring On A Steel Pole, Designed Arm - Description: Arm Designed For Fixing Videomonitoring Cameras., Standard Cpfl Energy Meter - With The Following Minimum Obligatory Characteristics. Limiting Itself To The Fixing Elements And Dema-Is) According To The Terms Of Reference, Rules Of The Municipalitys Energy Concessionaire And Annexes.-Made Of Polycarbonate With Uv Protection. Anti-Flame.-Allow The Application Of A Safety Seal/Screw.-Have Pre-Cuts For The Entry Of Electrical Ducts.-Have An Adjustable Crosspiece System, Which Allows The Use Of Different Standards Of Two-Phase Meters.-Come With A Circuit Breaker Box.-Meet The Standards/Norms Of The Local Energy Company (Cpfl).-Com Infrastructure And Cabling Accessories Necessary To Comply With The Previous Item (Standardscpfl), To Mention:-A Bi-Phase Measuring Box With Lens And Circuit Breaker Is Supplied And Installed, In Cpfl Standard (Electricity Concessionaire), Which Meets Current Norms.-The Bi-Phase Measuring Box Must Always Be Fixed On A Concrete Post Of The Cpfl, As Any Other Posts Are Not Approved By The Company So That Its Third Parties Can Support Them, They Do Not Have Resistance Tests, Among Others.-The Biphasic Measuring Box Must Always Be Fixed Facing The Sidewalk, For The Safety Measurement Of The Dealership Employee.-The Biphasic Measuring Box Must Be Fixed At A Minimum Height Of 4 Meters, Taking Care To Stay Free And Not Get Caught Together With Straps/Clamps From Other Operators (Cable Tv, Telephony), Or Be Too High For Subsequent Measurements.-Between The Measuring Box And The 2Nd Phase, A Pvc Cane Must Be Installed, With The Tip Of The Cane And The 2Nd Phase A Spacing Of 20 To 30 Cm.-The Measuring Box Must Not Be Fixed On The Same Level As The 2Nd Phase, A Minimum Distance Between The Box And The 2Nd Phase Of 1 Meter, Via The Cane.-The Measuring Box Must Be Fixed On A Pole, Outdoor Hermetic Box -With The Following Minimum Mandatory Characteristics:-Outdoor Hermetic Box Delivered Installed, As Term Of Reference And Attachments.-Aluminum Outdoor Airtight Box Must Be Provided With 1.5Mm Thick Plate In Minimum Dimensions Of 700Mm It Must Have An Internal Shelf At A Height Of 200Mm; - The Box Must Have At Least Three Holes For Cables With A Diameter Of 20 Mm For The Passage Of Cables Coming From The Street; - It Must Have An L-Shaped Mounting Plate For Attaching Accessories; - It Must Have Forced Ventilation Fixed To The Shelf In Order To Exchange Heat Between The Two Compartments Of The Box;-It Must Have The Following Accessories Installed Inside: Circuit Breaker For Electrical Protection, Socket Strip And Conduit
Contact Information
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 106153122
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.