|
Labor Service To Remove Two 9, 200 Posts To Replace Two 9, 300 Posts And Labor To Readjust The Energy Input Standard, Including Labor (Electrician, Electrical Engineer, Etc.) Equipment Necessary To Execute The Service. Also Included Are Various Services Such As Installation Of Post Posts, With Supply Of 01 Concrete Post 7M Mt, 04 Sleeve For Conduit Thread 2, 02 Curva 90 R Shorttop/Conduit Thread 2, 02 Washer For Conduit 2, 02 Bushing For Conduit 2, 01 Polyphase Measuring Box Cmd3--N3 488X385x216mm, 03 Screw Mad Phil Flat Chip 5, 0X35mm, 03 Bushing For Fixing Screw N 6, 10 Terminal Tcmc F Pin Comp. Masico 35.0Mm C/T 5/8, 01 Split Shoe Connector Pfs-35-90, 04 Pre-Insulated Copper Terminal Tpp-10-15 (10Mm), 03 Flex Cable 10.00 Mm, 35 Flex Cable 35, 02 Surge Prot Disp 45Ka 175V Class Ii Dps1, 01 Dim Circuit Breaker Beeper 90Amp, 01Washer For ¾ Conduit, 01 Bushing For 3/4 Aluminum Conduit, 01 Pvc 3/4 Bar 3 Mt Conduit, 01 Smooth Steel Tape 19/04X10 Fixwe, 06 Clamp For Steel Tape 19X0, 5Mm, 01 Clamp For Steel Tape 19X0, 03 Grounding Rod Bc 12, 3Mmx2, 40, 03 Double Earth Connector Type U Gtdu 5/8 Pa 30, 06 Copper Plated Steel Cord 25Mm, 03 Inspection Box N1 Conical Grounding, 110 Triplex Cable 35 Mm, 02 Concr... 12/11/2025 - 11:06:41
|