|
Supply Of Design, Manufacture, Supply, Installation, Testing, Commissioning And Maintenance Of Passenger Elevatordesign, Manufacture, Supply, Installation, Testing, Commissioning And Maintenance Of Passenger Elevator,Design, Manufacture, Supply, Installation, Testing, Commissioning And Maintenance Of Passeng Er Elevator With Machine Room Less And Gear Less Type 20 Persons/1360Kg Capacity,1M/S, With 4 Stops And 4 Openings With Two Years Warranty As Per Rdso Specification No. Rdso/2013/Em/Spec/0016 (Rev 02) -2025 With Latest Amendments Including 5 Years Comprehensive Annual Maintenance Contract.(Rate For Comprehe Nsive Annual Maintenance Contract For 5 Years After Completion Of Two Years Warranty Period To Be Quoted S Eparately Apart From The Rate Of Elevator).Provision For Sending Sms Message To Minimum 5 Pre Specified Ph One Numbers For Identified Unusual Occurrences Should Be Available In The Controller And To Be Provided. The Elevator Shall Be With Cctv Inside The Lift Car Connecting To Security Systems Through Wireless/Wifi If Any And Audio Announcement With Additional Technical Parameters For Passenger Lift Circulated By Hq Letters Dated 1 4.09.2023 & 09.10.2023 .The Lift Shall Be Installed In Channasandra Station Building And To Be Accommodate D In Already Constructed Lift Well. The Bidder Shall Get Himself Acquainted With The Site Condition To Know The Exact Amount Of Work Involved Before Quoting. [ Warranty Period: 24 Months After The Date Of Delivery ] [Quantity Tolerance (+/-): 5 %Age , Item Category : Normal , Total Po Value Variation Permitted: M Ax 8 Lacs ] ] , Design, Manufacture, Supply, Installation, Testing, Commissioning And Maintenance Of Passeng Er Elevator With Machine Room Less And Gear Less Type 20 Persons/1360Kg Capacity,1M/S, With 2 Stops And 2 Openings With Two Years Warranty As Per As Per Rdso/2013/Em/Spec/0016 (Rev 02) -2025 With Latest With La Test Amendments Including 5 Years Comprehensive Annual Maintenance Contract.(Rate For Comprehensive A Nnual Maintenance Contract For 5 Years After Completion Of Two Years Warranty Period To Be Quoted Separatel Y Apart From The Rate Of Elevator).Provision For Sending Sms Message To Minimum 5 Pre Specified Phone Num Bers For Identified Unusual Occurrences Should Be Available In The Controller And To Be Provided. The Elevator Shall Be With Cctv Inside The Lift Car Connecting To Security Systems Through Wireless/Wifi If Any And Audio An Nouncement With Additional Technical Parameters For Passenger Lift Circulated By Hq Letters Dated 14.09.202 3 & 09.10.2023.The Lift Shall Be Accommodated In Already Constructed Lift Well In Plat Form No 1 & Plat Form No 2 Of Channa Sandra Station . The Bidder Shall Get Himself Acquainted With The Site Condition To Know The E Xact Amount Of Work Involved Before Quoting. [ Warranty Period: 24 Months After The Date Of Delivery ] [Quantity Tolerance (+/-): 5 %Age , Item Category : Normal , Total Po Value Variation Permitted: M Ax 8 Lacs ] ] , Annual Maintenance Charge For The Maintenance Of Above Heavy Duty Elevators Of Machine Ro Om Less And Gear Less Type Of 20 Nos Passenger Capacity For 5 Years After The Expiry Of Warranty Period Of 2 Y Ears [ Warranty Period: 2 Years, Amc Period: 5 Years, Rate Of Discounting: 10 % ] ] At (Location) Dy.Cee/Hqrs/Cn/Bnc, Swr Karnataka 1.00 Set 4 479030620047A Amc (Y) Non Stock --- Yes Consignee Inr (Pe) Annual Maintenance Charge For The Maintenance Of Above Heavy Duty Elevators Of Machine Ro Om Less And Gear Less Type Of 20 Nos Passenger Capacity For 5 Years After The Expiry Of Warranty Period Of 2 Y Ears [ Warranty Period: 2 Years, Amc Period: 5 Years, Rate Of Discounting: 10 % ] ] At (Location) Dy.Cee/Hqrs/Cn/Bnc, Swr Karnataka 3.00 Set 3. T And C F.O.R Description Destination Delivery Period Description Delivery /Completion Rate Of Supply For All Items Completion : Within 6 Months Delivery Should Commence Within 3 Months From The Date Of Approval Of Gad. Normally Gad Shall Be Submitted By The Contractor Within 4Weeks And Approved By The Purchaser Within 6 Weeks From The Date Of Issue Of Po. In Case Of Delay In Approval Of Gad On Railway Account, Extension Of Dp Without Ld Shall Be Dealt With Accordingly Payment Terms S.No Description Payment Terms Page 2 Of 14 Run Date/Time: 10/12/2025 16:45:09Stores/South Western Rly Tender Document , Annual Maintenance Charge For The Maintenance Of Above Heavy Duty Elevators Of Machine Ro Om Less And Gear Less Type Of 20 Nos Passenger Capacity For 5 Years After The Expiry Of Warranty Period Of 2 Y Ears [ Warranty Period: 2 Years, Amc Period: 5 Years, Rate Of Discounting: 10 % ] ] At (Location) Dy.Cee/Hqrs/Cn/Bnc, Swr Karnataka 3.00 Set 3.
|