|
Siding With Metal Tile. Af_05/2018, Supply And Installation Of Workplate With Galvanized Sheet And Wooden Structure. Af_03/2022_Ps - Work Execution Board, Electrical Power Input, Overhead, Three-Phase, With Embedded Box, 10 Mm2 Cable And Din 50A Circuit Breaker (Concrete Post Not Included). Af_07/2020, Temporary Water And Sewage Connection, Conventional Lease Of Work, Using Template Of Pointed Running Boards Every 2.00M - 2 Uses. Af_03/2024, 10/12/2025 - 15:52:31, 10/12/2025 - 15:52:32, 10/12/2025 - 15:52:33, 10/12/2025 - 15:52:34, Execution Of Office On Construction Site Made Of Wood Sheet Plywood (3.30 In The Open Air, In Infrastructure Works, Including Loading, Unloading And Transport, On 1St Category Ground With Hydraulic Excavator (Bucket: 0.8 M³ / 111Hp), Fleet Of 7 10 M³ Dump Trucks, 3 Km Dmt And Average Speed 20Km/H Af_05/2020, Manual Excavation For. Crowning Block Or Footing (Without Excavation For Placing Formwork). Af_06/2017, Execution And Compaction Of Landfill With Predominantly Clay Soil - Exclusive Soil, Excavation, Loading And Transport. Af 11/2019., Masonry Inspection Box, 1/2 Common Brick, 0.6 Sewage, From The Box To The Network (Distance = 10 M, Trench Width = 0.65 M), Including Manual Excavation, Trench Bottom Preparation And Manual Backfilling With Mechanized Compaction, Pvc Pipe For Jei Dn 100 Mm Sewage Collection Network And Connections - Supply And Installation Af_03/2016, Mechanically Excavated Pile, Without Fluid. Stabilizer, 25Cm In Diameter, Concrete Placed By A Concrete Mixer Truck (Excluding Mobilization And Demobilization). N.2), Applied To Floors Or Slabs On Ground, Thickness Of *10 Cm*. Af_01/2024 - (Nursery), Separating Layer For Execution Of Radier, In Plastic Canvas Af_09/2021 - (Nursery), Slim Concrete Ballast, Applied To Crowning Blocks Or Footings, Thickness Of 5 Cm. Af_01/2024 - (Nursery), Insulated Footing Frame, Baldrame Beam And Running Footing Using 8 Mm Ca-50 Steel - Assembly. And Ground Floor Slab - (Nursery), Block Frame, Insulated Footing, Baldrame Beam And Running Footing Using 12.5 Mm Ca-50 Steel - Assembly Af_01/2024 - Baldrames And Ground Slab - (Nursery), Baldrame Beam And Running Footing Using 16 Mm Ca-50 Steel - Assembly. Af_01/2024 - Baldrames And Ground Floor Slab - (Creche), Insulated Footing And Running Footing Using 20 Mm Ca-50 Steel - Assembly. Af_01/2024 - Baldrames And Ground Slab - (Creche), Block Frame Using Ca-60 Steel.
|