|
Rental Of Storage Type Container - Minimum Area Of 13.80 M², Open Shed To Support Production (Carpentry, Armature Center, Workshop, Etc.) With Scissors, 4Mm Tile, Bleached Concrete Floor, Container Rental - Bathroom With Showers And Vases - 4.30 X 2.30M, Shed For Cafeteria In Plywood Works, Easel Kit For Water Measurement - Individual Entry, In Cpvc Dn 28 Mm (1), For 1 Meter - Supply And Installation (Exclusive Hydrometer). Af_03/2024, 10/12/2025 - 16:01:00, Hydrometer Dn 1/2, 1, 5 M3/H - Supply And Installation. Af_03/2024, Electricity Input, Overhead, Three-Phase, With Recessed Box, 10 Mm2 Cable And Din 50A Circuit Breaker (Concrete Post Not Included). Af_07/2020_Ps, Supply And Installation Of Workplate With Galvanized Sheet And Wooden Structure. Af_03/2022_Ps, Removal Of Separated Construction Site Debris Using A Metal Bucket - Earth, Masonry, Concrete, Mortar, Wood, Paper, Plastic Or Metal, Siding With Metal Tile. Af_03/2024, Junior Construction Civil Engineer With Additional Charges, Mobilization And Demobilization Of Site, Rental Of Metal Scaffolding Type Facade, Pieces Approximately 1.20 M Wide And 2.0 M Height, Including Diagonals In X, Connection Bars, Shoes And Other Items Required For Assembly, Including Assembly And Disassembly, Conventional Lease Of Work, Using Template Of Pointed Running Boards Every 2.00M - 2 Uses. Af_03/2024, Mechanized Trench Excavation With Prof. Up To 1.5 M (Average Upstream And Downstream/One Composition Per Section), Backexcavation. (0.26 M3), Width. From 0.8 M To 1.5 M, On 1St Category Soil, In Locations With A High Level Of Interference. Af_02/2021, Manual Excavation Of Trench With A Depth Of Less Than Or Equal To 1.30 M. Af_02/2021, Ballast With Granular Material (Crushed Stone N.1 And Crushed Stone N.2), Applied On Floors Or Slabs On Soil, Thickness Of *10 Cm*. Af_01/2024, Manufacture, Assembly And Disassembly Of Formwork For Crowning Block, In Sawn Wood, E=25 Mm, 4 Uses. Af_01/2024, Block Frame Using 5 Mm Ca-60 Steel - Assembly. Af_01/2024, Block Frame Using 6.3 Mm Ca-50 Steel - Assembly. Af_01/2024, Block Frame Using 8 Mm Ca-50 Steel - Assembly. Af_01/2024, Block Frame Using 10 Mm Ca-50 Steel - Assembly. Af_01/2024, Block Frame, Insulated Footing, Baldrame Beam And Running Footing Using 12.5 Mm Ca-50 Steel - Assembly. Af_01/2024, Baldrame Beam And Running Shoe Using 16 Mm Ca-50 Steel - Assembly. Af_01/2024, Concreting Of Crowning Block Or Baldrame Beam, Fck 30 Mpa, Using A Pump - Laying, Densifying And Finishing. Af_01/2024, Spreading Material With Crawler Tractor. Af_11/2019, Manual Trench Backfilling, With Percussion Soil Compactor. Af_08/2023, Surface Waterproofing With Asphalt Emulsion, 2 Coats. Af_09/2023, Technological Control Of Concrete, Assembly And Disassembly Of Formwork For Rectangular Pillars And Similar Structures, Simple Right Foot, Made Of Resin Plywood Sheet, 6 Uses. Af_09/2020, Pillar Or Beam Frame Of Conventional Reinforced Concrete Structure Using 10.0 Mm Ca-50 Steel - Assembly. Af_06/2022, Pillar Or Beam Frame Of Conventional Reinforced Concrete Structure Using 12.5 Mm Ca-50 Steel - Assembly. Af_06/2022, Pillar Or Beam Frame Of Conventional Reinforced Concrete Structure Using 16 Ca-50 Steel, Pillar Or Beam Frame Of Conventional Structure
|