|
Construction Work – 7025 - Østbyen, General Plan. Execution Of A Comprehensive Plan For Mnv Bolig Local Dept. 7025 In Kalundborg: Project Scope Appears In The Tender Documents. Below Is A Rough Outline Of What Is Included In The Project. The List Below Is Therefore Not Exhaustive And It Is The Extent Of Other Tender Material That Applies At All Times. - Facade Sections, All Blocks: Existing Facade Sections Including Windows, Window Sections, Entrance Doors And Terrace Doors Are Replaced With New Ones Incl. Follow-Up Work Such As E.G. Clearings, Sole Benches, Joint Seals, Etc. - External Stairs, Nørre Allé: New Door Openings For The Terrace Door Are Established, And New Steel Stairs Are Set Up, With A Landing And Protection For The Ground In All Ground Floor Homes On Nørre Allé. Incl. Hole Punching For Terrace Door, Foundation For Stairs - Interior Surfaces In Homes, All Homes: Option To Replace Wooden Floor Coverings And Skirting Boards, Etc. Replacement Of Fixtures Such As Cupboards In The Entrance Hall Ventilation. Painting Of Walls, Ceilings And Panels/Frames Etc. - Installations, All Blocks: New Installations For Both Water, Ventilation And Heating Incl. New Radiators. In Addition, Drains, Drainage Lines, Various Works Related To District Heating Etc. Pipe Boxes Are Made For Visible Pipe Runs And Associated Inspection Members. Electrical Installations In And Related Homes Are Changed. - Bathrooms, All Dwellings: Existing Bathrooms Are Renovated With New Front Walls, Floor Structure, Surfaces, Wet Room Membrane, Tiling And Tiling, Painting, Sanitation And Installations, Etc. - Kitchens, All Dwellings: New Installation Work Must Be Carried Out In The Residential Kitchens And, In This Connection, Existing Kitchen Equipment From Worktop Height Down To The Floor As Well As Tall Cupboards Placed During Installation Work Must Be Taken Down, Stored And Re-Established. It Is The Contractors Responsibility To Properly Dismantle Existing Kitchens, To The Extent Necessary For The Renovation Works, So That They Can Be Refitted. If It Is Assessed That A Kitchen Is In Such Poor Condition That It Cannot Be Taken Down Safely, Without Damaging The Elements, The Building Management Must Be Called Before Taking Down Starts, And In Sufficient Time That A Solution Can Be Found, Without This Affecting The Schedule And The Progress Of The Project. If Kitchens Are Taken Down And Damaged, Without Prior Agreement With The Client, The Re-Establishment Of Kitchens And Costs Associated With This Will Be Exclusively Borne By The Main Contractor And His Subcontractors. - Entrances, Holbækvej 4-10: Doorphone Systems Are Being Installed For The 4 Entrances. - Open Spaces: Changes To Open Spaces, Parking Areas And Road Conditions Are Carried Out As Indicated In The Project Material. - Constructions: Here, Reference Is Made To Construction Notes.
|