The Subject Of The Order Is The Implementation Of The Task Titled: Modernization Of The Roof Of The Village Community Center In Jakubów Lubiński, Przemków Commune. Scope Of Work: 1- Demolition Works 2- Assembly Works: 2.1 Covering The Roof With Coated Steel Roof Tiles And Making Mineral Wool Insulation 2.2. Sheet Metal Flashings - Gutters And Downpipes 2.3. Finishing Works - Ceiling Cladding With Plasterboards And Painting 2.4. Window Joinery - Installation Of Roof Windows 2.5. Chimneys 2.6. Lightning Protection Installation. Recommendations Regarding The Roof: - Replacement Of Damaged Elements Of The Substrate, - Repair And Impregnation Of Damp Elements Of The Wooden Roof Structure, - Complete Replacement Of The Roof Covering, - Repair Of Chimney Casings And Replacement Of Chimney Caps, - Installation Of New Thermal Insulation Of The Roof. Recommendations Regarding Prevention At The Construction Stage: 1 Carry Out Fungus Removal And Impregnation Works In Sufficiently Ventilated Rooms.2. Fungied Wood From Demolition Should Be Taken To An Appropriate Place And Burned.3. Use Dried And Impregnated Wood For Construction.4. Appropriately Protect The Wood To Be Built-In Against Moisture During Storage And Ensure That It Dries Out.5. During Renovation Works, It Is Necessary To Protect The Building Against Rainwater. Note: The Scope Of The Works May Be Limited If The Investors Supervision Inspector Allows Some Of The Existing Materials To Be Left (E.G. A Layer Of Mineral Wool). In Such A Case, A Report Of Abandoned Works Will Be Prepared, And The Settlement Will Be Based On The Works Actually Performed. The Contractor Is Obliged To Include The Above Possibilities In The Organization Of The Works And The Calculation Of The Schedule And Costs. Specification And Description Of The Accompanying Works And Temporary Works, Works Accompanying The Main Construction Works That Will Occur During The Implementation Of The Works Are: 1. Equipment, Maintenance And Decommissioning Of The Construction Site 2. Maintenance Of The Construction Site Equipment Together With The Machines 3. Measurements For The Settlement Of The Works Together With The Execution Or Delivery Of Instruments 4. Protective Measures In Accordance With Occupational Health And Safety 5. Maintenance Of Small Equipment And Tools 6. Transport Of Materials For Their Use 7. Removal Of Waste From The Construction Site That Does Not Contain Harmful Substances And Removal Of Waste Resulting From The Works Performed By Contractor. 8. Supervising Works Performed By Other Companies Under A Subcontracting Agreement. Note - A Detailed Description Of The Subject Of The Order Includes: Technical Documentation And Bill Of Quantities, Constituting Annexes To The Swz.
Contact Information
Address
Gmina Przemków,Przemków,59-170,Dolnośląskie,Pl516 - Legnicko-Głogowski
Contact No.
768319210
Email
p.info@przemkow.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 106049035
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.