|
Supply And Installation Of Construction Plate With Galvanized Sheet And Wooden Structure. Af_03/2022_Ps, Mechanized Cleaning Of Plant Layer, Vegetation And Small Trees (Trunk Diameter Less Than 0.20 M), Using A Tracked Tractor. Af_03/2024, Mobilization, Local Administration And Technical Monitoring Of The Work, Rental Of Water Or Sewage Networks. Af_ 03/2024, 09/12/2025 - 13:39:06, Mechanized Trench Excavation With Prof. Greater Than 1.5 M And Up To 3.0 M(Average Upstream And Downstream/One Composition Per Section), Excavator (0.8 M3), Width. Less Than 1.5 M, On 1St Category Soil, Locations With Low Level Of Interference. Af_09/2024, Mechanized Trench Backfilling With Backhoe Loader (Retro Bucket Capacity: 0.26 M³/Power: 88 Hp), Width 0.8 To 1, Depth 1.5 To 3.0 M, With 1St Category Soil (Without Replacement) And Percussion Soil Compactor. Af_08/2023, Preparation Of Trench Bottom With Width Less Than 1, With Layer Of Sand, Mechanized Launching. Af_08/2020, Preparation Of The Bottom Of A Trench With A Width Greater Than Or Equal To 1.5 M And Less Than 2, With A Layer Of Gravel, Manual Launching. Af_08/2020, Manual Launch. Af_08/2020., Collector Box 0, 80X0, 80X, 80, With Concrete Bottom And Top And Masonry Walls, Collector Box 1, 60X1, 70, Concrete Tube For Rainwater Collection Networks, 400 Mm Diameter, Rigid Joint, Installed In Location With Low Level Of Interference - Supply And Settlement. Af_03/2024, Diameter 600 Mm, Diameter 800 Mm, Opening For Simple Tubular Manhole D = 80 Cm Made Of Concrete, Wings With 30° Condensity, Including Formwork And Materials. Af_07/2021, Stone Mortared With Cement And Sand 1:3, 40% Mortar By Volume - Commercial Sand And Hand Stone - Supply And Laying. Af_08/2022, Regularization And Compaction Of Predominantly Clayey Soil Subgrade, For Pavement Construction Works. Af_09/2024, Construction Of Base And Sub-Base For Simple Graded Crushed Paving, 10 Cm Thick - Exclusive Of Loading And Transport. Af_09/2024, Medium Sand - Deposit/Supplier Station (Picked Up At The Deposit, No Transport), Surface Regularization With Motor Grader. Af_09/2024, Guide Laying (Curb) In Straight Section, Made Of Prefabricated Concrete, Dimensions 100X15x13x30 Cm (Length X Lower Base X Upper Base X Height). Af_01/2024, Execution Of Flooring On Interlocking Floor, With Block 16 Sides Of 22 X 11 Cm, Thickness 8 Cm. Af_10/2022., Ballast With Granular Material (Crushed Stone N.1 And Crushed Stone N.2), Applied On Floors Or Slabs On Ground, Thickness Of *5 Cm*.(Ref.: 100324), Execution Of Walkway (Sidewalk) Or Concrete Floor With Concrete Molded In Place, Machined C20, Conventional Finish, No Armed. Af_08/2022, Podotactile Alert Or Directional Floor, Made Of Concrete, Laid On Mortar. Af_03/2024, Batatais Grass In Plates, Without Planting, Planting Batatais Grass In Plates. Af_07/2024, Pedestrian Crossing Sign (45X45cm), In Number 16 Steel Sheet With Reflective Painting, Fixed In Dn 2 Galvanized Steel Tube, Anchored In A Concrete Block Of 30 Street Name Sign, Anchored Into A Concrete Block Of 30 X 30 X 50 Cm (L Af_05/2021, Painting The Curb With White Lime-Based Paint (Whitewash). Af_05/2021, Road Axis Painting About
|