|
1.1 Architect Engineer, Senior Level, Including Additional Charges, 1.2 General Manager With Additional Charges, 2.1 Supply And Placement Of Work Sign In Galvanized Sheet 26, Esp. 0.45 Mm, Plotted With Vinyl Adhesive, Affixed With 4.8X40 Mm Rivets, On Metal Structure Of Metalon 20X20 Mm, Special. 1.25 Mm, Including Autoclaved Eucalyptus Support Painted With Pva Paint Two 2 Coats, 2.2 Work Location With Template Of Running Boards Pointed Every 2.00M, Reuse 2X, Including Monitoring Of Topographic Team To Mark Topographic Point, 3.1 Construction Of Base And Sub-Base For Paving Soil. Sandy Lateritic Behavior, 15 Cm Thick - Excluding Excavation, Loading And Transport And Soil. Af092024, 09/12/2025 - 08:19:34, 3.2 Horizontal Excavation, Including Scarification In 2Nd Category Soil With 125H Crawler Tractorblade: 2, 70M3. Af072020, 3.3 Transport With 14 M³ Dump Truck, On Urban Road In Natural Bed Unit: Txkm. Af072020, 4.1 Construction Of Base And Sub-Base For Paving Soil With Sandy Lateritic Behavior, 4.2 Horizontal Excavation, 4.3 Transport With 14 M³ Dump Truck, 4.4 Pebble Or Rolled Gravel Type: Fine, 5.1 Execution Of Paving On An Interlocking Floor, With A Rectangular Block Natural Color Of 20 10 Cm, Thickness 8 Cm. Af102022, 6.1 Curb Guide, In Concrete With Fck 20Mpa, Pre-Molded, Mfc-01 Der-Mg Standard, Dimensions 12X16, 7X35cm, Exclusive Gutter, Including Excavation, Piling And Transport With Removal Of Excavated Material In Bucket, 6.2 Scu Urban Concrete Gutter, Type 3, With Fck 15 Mpa, Width 50Cm With Slope Of 25%, Esp. 7Cm, Der-Mg Standard, Exclusive Curb, Piling And Transport With Removal Of The Excavated Material In A Bucket
|