|
Supply And Installation Of Construction Plate With Galvanized Sheet And Wooden Structure. Af_03/2022_Ps, Siding With Metallic Tile. Af_03/2024, Construction Shed, Made Of Resin Plywood, Including Sanitary Installations And Der Mg Standard Furniture, Temporary Electricity Connection To Container, Temporary Water And Sewage Connection To Container (Construction Changing Room), Exclusive Electric Shower, 12/09/2025 - 16:11:37, 09/12/2025 - 16:11:38, Topographic Location Over Fifty (50) Reference Points, Including Marking Stake, General Foreman With Additional Charges, Senior Civil Engineer With Additional Charges, Demolition Of Solid Brick Masonry, Manually, Without Reuse. Af_09/2023, Demolition Of Simple Concrete - Manual, Manual Demolition Of Brick And Block Masonry, Demolition Of Simple Concrete - Manual., Removal Of Interlocking Block Or Portuguese Stone Flooring, With Reuse. Af_09/2023, Manual Loading Of Material Of Any Nature On Truck, Exclusive Transport, Transport Of Material Of Any Nature On Truck, Distance Greater Than 30Km, Within The Urban Perimeter, Exclusive Loading, Including Unloading - Milled Material, Removal Of Signage Plate, Manual Excavation Of Earth (Manual Digging), Including Side Unloading, Exclusive Removal And Transport Of Excavated Material, Sealing Masonry Made Of Hollow Concrete Blocks Of 14X19x39 Cm (Thickness 14 Cm) And Laying Mortar Prepared In A Concrete Mixer. Af_12/2021, Masonry For Sealing Hollow Concrete Blocks Of 14X19x39 Cm (Thickness 14 Cm) And Laying Mortar Prepared In A Concrete Mixer. Af_12/2021., Manually Compacted Landfill With Socket, Supply Of Structural Concrete, Prepared On Site, With Fck 20Mpa, Including Laying, Densification And Finishing, Waterproofing With Asphalt Emulsion, Two (2) Coats, Accessibility Ramp In Concrete Molded On Site, On Pre-Existing Sidewalk With A Width Less Than 3, 00 M, Fck 25Mpa, With Podotactile Floor. Af_03/2024, Chapisco With Mortar, Mixture 1:2:3 (Cement, Sand And Stone), Applied With A Spoon, Esp. 5Mm, Including Mortar With Mechanical Preparation, Plastering With Mortar, Mix 1:7 (Cement And Sand), Esp. 20Mm, Manual Application, Excluding Plating, Preparation For Plastering Or Painting (Latex/Acrylic) On Wall, Including One (1) Coat Of Acrylic Sealer, Acrylic Paint On Wall, With Manual Application, Exclusive Of Acrylic Sealer And Acrylic/Rubbing Putty (Pva), Mechanized Concrete Surface Polishing, Exclusive Concrete Finishing In Laser Leveling (Zero Level), Bullnose Cord Guide, In Concrete With Fck 20Mpa, Pre-Moulded, 10X10cm (Height X Width), Including One (1) Row Of Concrete Block, Esp. 9Cm, Excavation, Piling And Transport With Removal Of The Excavated Material (In A Bucket), Masonry For Sealing Ceramic Blocks Drilled Horizontally Measuring 14X19x29 Cm (Thickness 14 Cm) And Laying Mortar Prepared In A Concrete Mixer. Af_12/2021, Execution Of Flooring On Interlocking Floor, With Hexagonal Block Of 25 X 25 Cm, Thickness 10 Cm. Af_10/2022, Glossy Oil Painting On Metallic Surface, One Coat Including One Coat Of Anti-Corrosion Base, Surface Cleaning With High Pressure Jet. Af_04/2019, Application Of Industrialized Colored Cementitious Grout For Wall/Floor Coverings With Joints Up To 1Mm Thick, Floor Painting With Acrylic Paint, 2 Coats, Incl
|