Architectural, Engineering And Planning Services – Gis_Bkj_Ta. The Client Commissioned The Architectural Firm Heuer Faust Architekten, Aachen, To Plan The Property. It Is Now Intended To Outsource The Specialist Planning Services. The Following Services Should Be Awarded For The Ta In Accordance With Hoai: - Part 4 Section 2 § 56 Ff. Appendix 15 (Technical Equipment), The Awarding Of Service Phases 1 To 9 Takes Place In 4 Stages: - Stage 1: Service Phase 1-3 According To Hoai - Stage 2: Service Phase 4 According To Hoai - Stage 3: Service Phase 5-7 According To Hoai - Stage 4: Service Phase 8-9 According To Hoai The Decision Whether The Structural Implementation Is To Be Carried Out By A General Contractor Or By Individual Trades Will Be Decided During Lp 3. If A General Contractor Is Commissioned, Only Partial Services Of The Service Profile Are Commissioned In Stages 3 And 4. Building Technology Requirements: All Building Technology Systems Must Be Checked As Part Of The Measure And Assessed For Possible Reuse. The Assessment Must Include Which Changes Are Necessary Due To Normative And Energy Requirements And Which Ones Make Technical Sense. In The Area Of Drinking Water, Particular Attention Must Be Paid To The Points Of Drinking Water Hygiene, Fire Water Separation And Fire Barriers. In Heating Technology, The Heat Generation, Distribution And Transfer System Must Be Checked And Replaced. If Possible, The Building Should Continue To Use Little Mechanical Ventilation Technology In The Future And Be Naturally Ventilated. The Warm Air Heating Of The Sports Hall Is To Be Replaced By A Ventilation System With Heat Recovery And Heating Is To Be Ensured Via Efficient Ceiling Or Sports Floor Heating. The Electrical Systems Were Extensively Renovated In 2007/2008. The Systems Must Be Checked For Reuse As Part Of The Measure. The Existing Control Components From Siemens Should Also Be Meaningfully Checked For Reuse During The Renovation. Development And Presentation Of A Plan That Implements The Execution In An Economical Manner, Complies With The Expansion Standards Of The Düren District And Takes Into Account All Coordination With The Client And The User That Still Needs To Be Carried Out To Concretize The Result To Be Achieved, To The Extent To Be Determined Jointly. System Groups System Group 1 - Kg 410 Wastewater, Water And Gas Systems System Group 2 - Kg 420 Heat Supply Systems System Group 3 - Kg 430 Ventilation Systems System Group 4 - Kg 440 Power Systems System Group 5 - Kg 450 Telecommunications And Information Technology Systems System Group 7 - Kg 470 Usage-Specific And Process Engineering Systems System Group 8 - Kg 480 Building Automation Preliminary Project Costs According To Rough Cost Estimate Feasibility Study: Kgr 300 Eur 8,163,506.07 Net Kgr 400 Eur 3,336,549.29 Net Basics Of Service Provision Planning Must Begin Immediately After The Order Is Placed. The Services To Be Provided Must Comply With The Generally Recognized Rules Of Architecture/Technology, The Host
Contact Information
Address
Bismarckstraße 16
Contact No.
+49 221 97300293
Email
vergabe@lenz-johlen.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 106028331
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.