|
Construction Work For Pipelines, Communication And Power Lines, For Highways, Roads, Airfields And Railways; Flatwork - Design And Construction Of The S10 Piła - Bydgoszcz Expressway From The Wyrzysk Junction To The Bydgoszcz Zachód Junction, Section 1: Wyrzysk Junction (Without The Junction) - Nakło Nad Notecią Junction (With The Junction). Not Limited To The Works Listed Below, But In Accordance With All Other Requirements Specified In The Fup And Resulting From The Applicable Law, Within The Accepted Contract Amount, The Contractor Will In Particular Design And Perform The Following Works: 1) Construction Of The S10 Expressway, 2) Construction Of The Road Junction: Sadki, Nakło Nad Notecią And Reconstruction And Renovation Of Slip Roads Of The Junction: Wyrzysk, 3) Construction Of The Passenger Service Area (Mop): Mrozowo Południe, Mrozowo Północ, 4) Construction Of A Road Maintenance Circuit (Od) With An Administrative And Social Building And Accompanying Buildings, In The Area Of The Nakło Nad Notecią Junction, 5) Reconstruction Of Existing Roads In The Scope Of Collision With An Expressway, However, In The Case Of National Road No. 10, It Is Required To Be Reconstructed To A Technical Class Of Min. G And Connections In The Area Of The Wyrzysk Junction; 6) Construction/Reconstruction Of Roads Other Than The Expressway, Including Changing The Alignment Of Existing Roads, In Order To Restore Damaged Road Connections Or Provide Access To The Property, 7) Construction Of Additional Roads Located In The Expressway, 8) Construction And Reconstruction Of Infrastructure For Pedestrians And Cyclists, 9) Construction Of Emergency Crossings And Emergency Exits, Entries And Exits To The Expressway, 10) Construction Of Service Lanes (Paved Lanes) Area For Maintenance Purposes) 11) Construction Of Engineering Structures, 12) Construction And Reconstruction Of The Area Drainage System, 13) Construction And Reconstruction Of Environmental Protection Devices, In Particular: Acoustic Protection, Animal Crossings, Ecological Culverts With Protective And Guiding Fencing, Greenery And Fencing Of The Expressway, Anti-Glare Screens, 14) Removal From The Construction Site And Disposal Of All Identified Plants That Are Invasive Alien Species, 15) Removal From The Construction Site And Disposal Of Waste Identified In Previously Prepared Documentation, 16) Construction And Reconstruction Of Infrastructure For The Needs Of Expressway Facilities Located Along The Expressway, 17) Reconstruction Of Conflicting Devices And Networks Of Existing Underground And Above-Ground Infrastructure, 18) Demolition Of Buildings And Structures, Demolition Of The Existing Road Structure And Indicated Engineering Structures, Demolition Of Road Elements, Culverts And Others, 19) Construction Of A Network Telecommunications For The Needs Of The Employer, 20) Construction And Reconstruction Of Road Lighting, 21) Implementation Of Traffic Organization, Including Road Traffic Safety Devices, 22) Cleaning And Unblocking Existing Watercourses, Drainage Devices And Receivers To The Extent Ensuring Effective Drainage Of Water From The Road, 23) After Completion Of The Works, Full Recultivation Of The Areas Occupied By Technical And Social Facilities, The Construction Site, Temporary Roads, 24) Carrying Out Repairs In Scope Of Restoring Roads, Properties Used By The Contractor Or Buildings Damaged As A Result Of The Contractors Activities To A Technical Condition No Worse Than Before
|