|
Construction Work – Design And Execution Of Works For The Project Titled Works On The Cross-City Line In Warsaw, Section Warszawa Wschodnia - Warszawa Zachodnia, Stage Iia. The Subject Of The Order Is The Design And Execution Of Works For The Project Titled: Works On The Cross-City Line In Warsaw, Section Warszawa Wschodnia - Warszawa Zachodnia, Stage Iia The Basic Scope Includes: Preparation Of: A) Necessary Design Documentation, Including Construction, Executive, Technical/Technological Designs, Obtaining The Necessary Administrative Decisions And Execution Of Works In The Field Of Reconstruction Of The Warszawa Wschodnia Station (Together With Adjacent Sections) From The Warszawa Wschodnia Station To Ul. Szczecin Coast And The Construction Of A New Railway Line Connecting Railway Lines No. 7 And 9, Together With The Construction, Reconstruction And Demolition Of Buildings, B) Necessary Design Documentation, Including Construction, Executive, Technical/Technological Designs, Obtaining The Necessary Administrative Decisions And Carrying Out Works In The Field Of Development Of The Csdip System With The Adaptation Of The Lan/Wan Network And Modernization Of The Telecommunications Sewage System For The Emergency Services. Ochota, Acting Śródmieście, Acting Powiśle And Warszawa Centralna Station. The Description Of The Option Right And The Interface Option Can Be Found In Section 5.1.1 Purpose, In The Field: Option Description. The Entire Subject Of The Order Includes The Execution Of The Following Elements: 1) Design Documentation Necessary For The Proper Performance Of All Construction Works And Obtaining All Required Opinions, Arrangements, Approvals, Conditions, Decisions And Permits Necessary For The Implementation Of The Subject Of The Order In Accordance With The Indicated Scope; 2) All Construction Works In Accordance With The Scope Of The Order And All Preparatory Works Necessary To Perform The Subject Of The Agreement And All Activities Required By Law, Including Works In The Scope Of: A) Track Systems With Subgrade, Track-Side Works And Drainage, B) Rail-Road Crossings And Rail Level Crossings, C) New Roads, Sidewalks, Pedestrian And Bicycle Routes Along With Drainage And Other Accompanying Infrastructure (Including Fences) Being As A Consequence Of Agreeing Design Solutions With The Manager, D) Station And Line Railway Traffic Control Devices, E) Construction Of Cubature Facilities, F) Construction Of Lcs, Cuid Devices, Csdip, Smw, Cctv, Szb, Bms, Sswin, Skd, Ssp, Dso, Sos Devices, G) Telecommunications Cables With Collision Reconstruction And Teletransmission, H) Data Transmission Networks For Control And Management Purposes Railway Traffic And For The Needs Of Other Systems, I) Engineering Structures, Including: Viaducts, Railway Overpasses, Culverts, Passages Under The Tracks, Tunnels, Retaining Structures Along With The Accompanying Infrastructure, J) Platforms With Roofing And Accesses, Drainage And Necessary Installations, Including Elements Of Small Architecture And Information For Travelers (Development Of Platforms), Taking Into Account The Problem Of Architectural Barriers For Disabled People, K) Main Cable Ducts Cable Routes, Including: Electric, Railway Traffic Control, Telecommunications, L) Traction Network Along With Elements Related To
|