1. The Subject Of The Order Is The Implementation Of The Task Titled: Thermal Modernization Of The Primary School In Błogiem Government, Błogie Governmentowe 39, 26-341 Mniszków, In The Design-Build System, In A Manner Consistent With The Dnsh Principles, This Should Be Understood As The Principle Of Do No Significant Harm Within The Meaning Of Art. 17 Of The Taxonomy Regulation, The Delegated Acts Adopted Pursuant To This Regulation And The European Commissions Guidelines On The Application Of The Principle Of Doing No Significant Harm In Relation To Regulation 2021/241.2. Scope Of Construction Worksthe Scope Of The Main Construction Works Includes Thermal Modernization Of The Building Consisting Of: - Disassembly And Demolition Works, - Insulation Of External Walls Above The Foundation Zone (Area Of Approx. 484.95 M2 Including With Foundation Walls), Insulation Of Foundation Walls And Basement Walls With Moisture-Proof Insulation (Area: Approx. 484.95 M2 Including Insulation Of External Walls Above The Foundation Zone), Insulation Of Flat Roof Covered With Roofing Felt (Building Above The School Building), Area Approx. 338.10 M2, Ceiling Insulation Under The Unheated Attic (Part With Staircase), Area Approx. 73.98 M2, - Construction Of A New Roof Over The Connector And The Back Room With New Insulation (Area: Approx. 120.74 M2), - Renovation Of The Roof Of The Gymnasium With New Insulation (Area: Approx. 327.90 M2), - Replacement And Installation Of Window Joinery In The Building Of The Gymnasium, Area: Approx. 83.67 M2, - Demolition Of The Chimney Of The Central Heating Installation, - Accompanying Works. Scope Of Electrical Works: - Replacement Of The Lightning Protection System, - Replacement Of The Earthing Installation, - Construction Of A Photovoltaic Installation, - Execution Of Equalizing Connections, - Power Supply For New Sanitary Equipment, - Construction Of An Emergency Lighting Installation, - Construction Of Batteries To Compensate For Reactive Power. Scope Of Internal Sanitary Works: Development Includes Guidelines For The Design And Implementation Of Sanitary Installations For The Building Of The Primary School In Błog. The Study Includes: Dismantling The Existing Coal-Fired Boilers, Equipment, Pipelines And Fittings In The Coal-Fired Boiler Room, Dismantling The Complete Heating Installation In The Building (Pipelines Running On The Surface, Radiators And Fittings), Renovation Of The Boiler Room (Cleaning The Ceiling, Walls, Floor, Replacing Doors And Windows, Filling In Gaps, Repainting The Walls, Etc.), Replacing The Existing Boiler Room Coal Ground Heat Pump, I.E. Construction Of A Glycol-Water Ground Heat Pump, Construction Of A Buffer System, Construction Of A Lower Heat Source (Vertical Heat Exchangers), Installation Of A Domestic Hot Water Heater, Installation Of Pipelines, Other Devices And Fittings, Construction Of A Complete Heating Installation In The Building (Installation Of Radiators, Piping, Fittings), Performa
|