Construction Work – Gevelherstel Flux. The Flux Building On The Tu/E Campus (Completed In 2014) Has A Second Skin Facade Of Approximately 9,700 M². In 2024 It Was Determined That Rubbers Of The Outer Glass Profile Were Coming Loose And Some Glass Panels Had Sagged, Causing A High Risk Of Glass Failure. The Building (29,630 M² Gross Floor Area, 10 Floors, Approx. 41 M High) Has An Educational And Office Function With Several Labs. Research By Third Parties And An External Consultancy Led To A Recovery Report And Technical Description. Because The Facade Construction Is Not Demonstrably Safe, Tu/E Carries Out Periodic Inspections, Places Fuses On Glass Plates And Uses Drones For Point Cloud Measurements. Ultimately, The Entire Second Skin Facade Will Have To Be Replaced. The Flux Building Has A Gross Floor Area Of 29,630M2, Has 10 Floors And Is +/- 41M High. The Building Has An Educational And Office Function Where There Are Several Labs That Are Used By Various Faculties. Fluxs Second Skin Facade Is +/- 9,700M2.
Contact Information
Address
Leeghwaterlaan 8
Contact No.
+31 883621000
Email
info.rechtbanksHertogenbosch@rechtspraak.nl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 105973921
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.