Rudolfovská Street (Na Sadech - Nádražní) - 2Nd Stage. The Subject Of The Public Contract Is The Complete Reconstruction Of Rudolfovská Trády In A Historical Building Connected To The Historic Preservation/City Center Of České Budějovice, Namely In The Section From Jeronýmova Street To Plot No. 106/1. Part Of This Action Is Close Coordination With The Work Of Other Investors And Suppliers, E.G. During The Reconstruction Of Gas Pipelines Laid On Both Sides. The Contractor Will Be Obliged To Coordinate The Work With The Event Reconstruction Of The Ntl Gas Pipeline Čb Rudolfovská Class Ii. Stage (Section No. 71, No. 1955/35 - Jeronýmova ), Whose Investor Is Gas Distribution S.R.O., Křižíkova 1698/2, 370 01 České Budějovice. The Construction Must Seamlessly Follow The First Stage Of The Reconstruction Of Rudolfovská Street, Which Ends At Jeronýmova Street. This Is A Backbone Communication, And With Regard To The Scope Of The Work, The Subject Of This Contract Is The Second Stage Of Approx. 275 Meters In Length. This Is Further Divided Into Two Construction Seasons. The Width Of The Street Profile Is Determined By The Multi-Storey Historical Building, Which Houses A Significant Number Of Establishments, An Important Exit Is, For Example, The Entrance To The Mitsubishi Company Premises. The Coverage Of Some Utility Networks Will Be Minimal, And Therefore It Is Necessary To Adapt The Construction Work To This Condition In Order Not To Violate These Networks. It Also Includes Traffic-Engineering Measures To Restrict Traffic On The Existing Road And The Surrounding Area During The Construction Of Roads And Utility Networks. The Dio Will Be Modified/Supplemented According To The Work Progress Of The Construction Contractor And Discussed With The Di Pčr Before The Implementation Of The Construction. The Dio Design Is Based On The Assumption Of Two Sub-Stages. The Dio Modifications Will Also Trigger Modifications In The Ssz Management At The Intersections In The Detour Route, Which Will Be Returned To Their Original State After The Construction Is Completed. Furthermore, The Removal Of The Traction Catenary Line, Including Overhangs, And The Reassembly Of 2 Ttv Routes Leading To The Mast In Otakarova Street Will Be Addressed. The New Sewer Collector Will Be Concreted On Site And Is Designed With A Rectangular Profile, Especially 800/800. The Rectangular Profile Will Ensure The Possibility Of Switching Connections To The Lowest Possible Level. At The Bottom Will Be Concreted Kineta With A Basalt Groove Placed In A Special Mortar. The Structure Of The Sewer Collector Will Be Reinforced Concrete Monolithic With A Prefabricated Ceiling. The Gutter Will Be Divided Into Expansion Sections. In Each Dilatation Section, In Addition, In The Walls Of The Controlled Sealed Working Joints, Into Which A Metal Seal With A Bitumen Coating Will Be Inserted For A Controlled Crack. The Construction Of The Sewer Channel Is Expected In Parts. Earthworks For Water Supply And Sewerage Will Be Carried Out As Earth Trenches. In The Route Of The Sewerage, There Will Be Fencing Using Brush Walls With Spacer Frames. The Water Lines Will Be Made On Both Sides Of The Road From Ductile Cast Iron Of The Dn150 Profile. A Replacement Water Supply Will Be Carried Out From A Pe 100Rc Sdr17 Pressurized Water Supply Polyethylene Pipe With Storage In A Shallow Groove 0.5 M Deep. After The Installation Of The Water Mains And Dry Pipes, Pressure Tests, Disinfection, Flushing And Analysis Of The Water Will Be Carried Out. Dry Pipes Will Be Carried Out In Sub-Stages. The Distribution Of Public Lighting Will Be Implemented Gradually. The Lighting Points Are Located On Cable Suspensions And Ttv Masts. These Will Be Replaced. The Implementation Will Take Place Gradually So That The Existing Public Lighting Is Always In Operation. Light Signaling Device: A Polyethylene Microtubular Cable Will Be Laid In Parallel With The Vo Cables. Construction Objects: 00 Other And Ancillary Construction Costs So 01 Communication And Paved Surfaces So 02 Sewers And Connections Dso 02.1 Sewage Dso 02.2 Sewer Connections So 03 Plumbing And Connections Dso 03.1 Water Supply Dso 03.2 Plumbing Connections So 04 Public Lighting So 05 Light Signaling Device
Contact Information
Contact Person
Bc. Petra Kochtová
Contact No.
+420 386 803 218
Email
kochtovap@c-budejovice.cz
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 105923391
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.