Tender For Special Repair To Road And Road Furniture Form Gate No-1 To Eklavya Chowk At Nabagram Military Station.; 1 Scarifying or picking gravelled macadam or bituminous macadam surfaces in area n. exc 400 sqm and depth exc 50 mm but not exceeding 100 mm deep by any means refer SSR Preambles of SSR IC-20043 (Scarifying include over and grading the broken up surface to the proper camber etc. as required), complete all as specified and directed. 2 M & L of 7.5cm thick (compacted thickness) WBM(Water Bound Macadam), with coarse aggregates of Limestone, sand stone, Flint or Quartzite of grading 2 (63 to 40mm size) or of grading 3 (50 to 20mm size), spread, rolled with 8 to 12 tonne capacity road roller and consolidated to gradient and camber requiredas per IRC: 19-1977 complete all as specified and directed. 3 Preparation of unsurfaced Water Bound Macadam (WBM)/ Wet Mix Macadam (WMM) surfaces by brushing with wire brushes for removing caked mud, sweeping with brooms and finally fanning the cleaned surface with gunny bags to remove all loose dust or dirt etc. & M&L & applying evenly a prime coat of Cationic Bitumen emulsion SS-1 conforming to IS : 8887 at a rate of application of 0.7 - 1.0 kg/sqm on surface of WMM/WBM as specified in Table 500-3 of MoRTH specification for Road and Bridge Works 2013, using mechanical sprayer after cleaning of existing surface, complete all as specified and directed. 4 M&L premixed bituminous macadam over primed surface of road using paving bitumen VG-30 & temperature as per table 500-1 & 500-2 of MoRTH & as per IS : 73, laid/rolled by 8 to 10 tonne capacity roller and compacted to required gradient and camber (consolidated thickness 75 mm or less) including preparation of area before laying of Macadam with mechanical paver, binder contents of premixed macadam shall be 4% by weight of total mix (Design Mix), complete all as specified and directed.[Note : (i) Work shall be executed after approval of design mix of bituminous macadam by GE.(ii) Calibration of Hot Mix Plant shall be submitted to Engr-in-Charge for approval.(iii) Payment shall be made to Contractor after submission of approved design mix, bitumen extraction report, Road Roller register & calibration report.(iv) Exact qty of binder to be used shall be ascertained by Design Mix.(v) Minimum 4% binder shall be used. However, in case more than 4% of binder content is required as per design mix, the same shall be provided by the contractor at no extra cost to dept(vi) Course aggregates physical property as per MoRTH table 500-6 & mixing of all aggregates as per table 500-7 of MoRTH.(vii)Unit rate quoted by bidder shall inclusive testing charges as above & as per MoRTH & no extra claim against testing charges shall be entertained later on.] 5 M&L Bituminous semi dense asphaltic concrete, 40mm consolidated thickness with minimum 5.5% binder with paving bitumen (VG-30) [Mix Design criteria as per SSR Part-I Clause 20.B.2.11, or as per MoRTH by Marshal method (Ref table 500-12 to 500-16)] coarse aggregate, fine aggregate, filler cement (OPC - 43 Gde) as per recommendation of design by weight of total mix from hot mix plant, rolled by with 8 to 12 tonne vibrating (tandom) road roller to confirm uniform surface and compacted to required camber and gradient including preparing black top surfaces by brushing with wire brushes for removing caked mud etc., sweeping with brooms and finally fanning the cleaned surface with gunny bags to remove all loose dirt etc. and applying evenly a tack coat of rapid setting cationic bitumen emulsion RS-1 conforming to IS : 8887 at a rate of application of 0.2-0.3 kg/sqm on bituminous surface as specified in Table 500-5 of MoRTH Specification for Road and Bridge Works 2013, using mechanical sprayer, complete with mechanical paver, complete all as specified and directed. 6 Item Ser No 1.05 Contd…….[Note : (i) Work shall be executed after approval of design mix of semi dense asphaltic concrete by GE.(ii) Calibration of Hot Mix Plant shall be submitted to Engr-in-Charge for approval.(iii) Payment shall be made to Contractor after submission of approved design mix, Bitumen Extraction Report, Road Roller Register & Calibration Report.(iv) Exact qty of binder to be used shall be ascertained by Design Mix.(v) Minimum 5.5% binder shall be used. However, in case more than 5.5% of binder content is required as per design mix, the same shall be provided by the contractor at no extra cost to dept.(vi) All testing charges shall include in unit rate quoted by bidder.][Note : (i) Work shall be executed after approval of design mix of semi dense asphaltic concrete by GE.(ii) Calibration of Hot Mix Plant shall be submitted to Engr-in-Charge for approval.(iii) Payment shall be made to Contractor after submission of approved design mix, Bitumen Extraction Report, Road Roller Register & Calibration Report.(iv) Exact qty of binder to be used shall be ascertained by Design Mix.(v) Minimum 5.5% binder shall be used. However, in case more than 5.5% of binder content is required as per design mix, the same shall be provided by the contractor at no extra cost to dept.(vi) All testing charges shall include in unit rate quoted by bidder.] 7 M&L preparing bituminous surfaces of road by cleaning and preparing the road surface and making good the road marking location and marking / applying 2.5 mm thick white or golden yellow reflective hot thermoplastic road marking paint (Hot application) for centre lines, stop lines, dashes, arrows etc. and the like n. exc 10cm wide on roads pavements confirming to BS 3262-1989 laid down through modern propelled road marking machine in a layer of CRYSTALEX with special applicator machine through modern propelled road marking machine in a layer all as per manufacturers instruction and use of all ingredients such as binder, glass beads, titanium dioxide, calcium carbonate, interfiller thermoplastic required for glass beads per sqm by incorporating the white/ yellow beads for reflectivity in 100 mm width, complete all as specified and directed. 8 Repair to potholes depth of potholes exc 30 mm, not exc 1 sqm each including sweeping free from dust and mud, or water, scoring sunken surfaces in roads, paths, etc. cutting around edges to at least 25 mm in depth, making good applying tack coat @ 5 kg per 10 sqm of VG-10 grade of paving bitumen, putting in premixed bituminous macadam, well rammed and sealed with binder 9.8 kg per 10 sqm of VG-30 grade of paving bitumen, blinded with 0.09 cu m of stone chippings, 6.3 mm size and again well rammed (including supply of premixed macadam, binder and chippings), complete all as specified and directed.[Note : Pot holes register to be maintained by Engr-in-Charge and payment shall be made as per Pot holes register.] 9 S&F in repairs sparkle Solar Road Studs unbreakable made out of Acrylonitrile Butadiene Styrene (ABS) materials and weather proof Aluminium Alloy shell di-cast housing mat finished anti twisted ribs on the bottom anchor of size 125mm x 125mm x 25mm (including shank 65mm) both side reflector, and solar battery 1.2V 1600 MA (Mi-Cd) rechargeable solar panel 0.3 W light source 6 pcs super bright LED with stem in replacement with automatic dark to dawn solar suit, view distance upto 10000 to 18000 mcd (milicandela), bearable weight 10 tonne (approx) with bright LEDs as light source complete with integrated battery, sensor optics and solar cell to ensure enerty saving stand along operations including one steel pipe of 8mm dia and 50mm long and 2 component epoxy (hardener & resin), quartz sand for fixing the road stud surface, complete all as specified and directed. 10 S&F in repairs Cat Eyes pavement marker two way reflective of minimum size (100 to 110)mm x (100 to 130)mm x (24 to 30) mm with aluminium alloy body with micro prismatic lens type technology with reflective lens to be fixed epoxy resin adhesive after cleaning the surface and reflective panels Amber/Red/White the help adhesive and screws, complete all as specified and directed. 11 S&F in repairs metal retro-reflective Tubular Delineator made out of ABS round body fitted with 2 Nos 65 mm dia highly reflective reflectors made out of PMMA and mounted on 45/50 mm dia mild steel pipe/ post of 1010 mm height duly powder coated (minimum 40 micron) and thermo plastic elastomer 3 bands of green, red and yellow reflector radium tape of 25 mm wide strips with anti theft steel net for reflector protection including supply and providing of embedding in Plain Cement Concrete 1:2:4 (150 x 150 x 300mm) type B1, complete all as specified and directed.[Note : Delineators shall be made from Class-C full cube corner, micro-prismetic, non metallic, retro-reflective sheets, should meet the reflective value requirement of type XI sheeting specifications as per IRC-67 & meeting the Co-efficient of retro-reflection values as per ASTMD 4956 table specification.] 12 S&F Rubber based yellow & Black size 500x350-365x50 mm Speed Breaker studded with Reflective Arrow on either side with arrangement of 8 Nos bolts, hihgly resistent to severe impacts, UV Stablized, Bearing Capacity 20 T to 30 Model ASRSBWAT complete all as specified and directed. 13 S&F in repairs for Polycarbonate Convex Mirror Outdoor type 600 mm dia made out of fibre along with bracket, Pole mounted and fixed to 80 mm bore Medium Grade MS Pipe of required length, mirror thickness - 3mm, mirror material - polycarbonate, mirror weight - 4 Kg, shape - circular, mirror angle - 130°, fully pipe length - minimum 600mm of black powder coated paint, back holding, plate material - fibre reinforced plastic, body material - ABC plastic complete and embedded in PCC 1:3:6, Type C-1 including necessary earthwork required for post holes, complete all as specified and directed.
|