|
1. The Subject Of The Basic Order Is The Preparation For The Ordering Party Of Complete, Multi-Discipline Design Documentation For The Construction Of A Sanitary Sewage System In Tulce, Kleszczewo Commune, Together With Sewage Pumping Stations And The Construction Of A Water Supply Network And Pavement On Ul. Pocztowa In Tulce, To The Extent Necessary To Obtain All Administrative Decisions Required By Law And Enabling The Ordering Party To Conduct A Public Procurement Procedure For The Implementation Of Construction Works. A) The Documentation Will Be Prepared In Accordance With Applicable Regulations, In Particular The Act Of July 7, 1994 - Construction Law And Implementing Regulations, In The Arrangement Specified In The Regulation Of The Minister Of Development Of September 11, 2020 On The Detailed Scope And Form Of The Construction Design, And Will Include In Particular: Obtaining And Updating Maps For Design Purposes On A Scale Appropriate To The Investment, With Infrastructure Marked And Verified In The Field, B) Performing Geotechnical Research And Developing A Geotechnical Opinion And - If Necessary - Geological And Engineering Documentation, In Accordance With The Geotechnical Category Of The Facility, C) Preparing A Land Development Design, Architectural And Construction Design And Technical Design In The Sanitary And Road Industry (Pzt, Pab, Pt), Including In Particular: - In Sanitary Industry: Route Of The Designed Sanitary Sewage And Water Supply Network, Profiles, Locations And Structures Of Sewage Pumping Stations, Instructions For Start-Up And Operation Of Sewage Pumping Stations, Connection To The Power Network Of Sewage Pumping Stations, Automation, Elements Of The Sanitary Sewage Network Such As Inspection Wells, Expansion Wells, Connection Wells, Elements Of The Water Supply Network Such As Gate Valves, Nodes, Fire Hydrants, Jacking Or Drilling, - In The Road Industry: Road Geometry, Cross-Sections, Profiles, Road Surface Structures, Sidewalks, Drainage, Traffic Safety Elements, D) If It Is Impossible To Run The Sewage Network Without Collisions, Implementation Of Projects For The Reconstruction Of Existing Networks And Technical Infrastructure Devices, Including: - Storm Sewage - In The Scope Of Collisions And Reconstruction, - Water Supply Network - In The Scope Of Collisions And Reconstruction, - Gas Network - In The Scope Of Collisions And Reconstruction, - Electricity Networks – In The Scope Of Collisions And Reconstruction, – Telecommunications Networks – In The Scope Of Collisions And Reconstruction, – Drainage Devices And Road Culverts – In The Scope Of Collisions And Reconstruction, E) Preparation Of A Fence Design And Entrances To Sewage Pumping Stations, F) Preparation Of A Lighting Design For Pedestrian Crossings, G) Preparation Of A Target Design Of Vertical And Horizontal Markings As Part Of Permanent Traffic Organization, H) Preparation Of A Greenery Inventory, Along With The Development Of A Tree Management Pro
|