|
Execution Of Construction Works And Post-Construction Inventory Through Adaptation Of The Building Of The Social Welfare Home At Ul. Kurasia 7 In Tarnobrzeg To The Existing Fire Protection Regulations In The Scope Of: - Dismantling Supporting Structures For Boxes By Drilling Holes Or Unscrewing Them (Applies To Existing Smoke Detectors, Rops And Fire Protection Control Panel), - Piercing Holes In Walls Or Ceilings, - Laying Cables In Ready-Made Grooves On A Surface Other Than Concrete, - Screwing Pvc Electrical Installation Strips On Bricks, - Embedding Plastic Dowels And Metal Dowels Shot Into Walls Or Ceilings, - Installing A Compact Alarm Control Panel - Fire Alarm Control Panel, - Installing Power Supplies (Up To 12V Dc), Up To 6.5W - Smoke Exhaust/Fire Door Control Panel, - Installing Addressable, Universal, Optical Scattered Smoke Detectors, - Installing Addressable Multi-Sensor Smoke And Heat Detectors, - Installation Of Addressable Heat Detectors, - Installation Of Manual Fire Alarms, - Installation Of Manual Smoke Exhaust Buttons - Installation Of Acoustic And Optical Alarms, - In Addition To The Basic Design And Bill Of Quantities, As-Built Documentation Should Be Prepared Agreed With A Fire Expert And Signed By Designers Of A Given Industry Along With A Certificate Of Correct Execution - Air Vents Should Be Installed In 3 Staircases And Appropriate Automatic Door Opening Control Should Be Provided Air Supply Systems, - Colliding Doors In The Fire Zone Of The Staircase Should Be Properly Removed, - External Doors Should Be Replaced With Air Intake Doors With Parameters Consistent With The Technical Conditions For External Partitions Equipped With Appropriate Actuators, - Automatic Flap Control Connected To The New Fire Control Panel Should Be Implemented And Its Retrofitting Should Be Planned, - They Should Be Secured At The Transitions Between Fire Zones, - A Fire Scenario Should Be Prepared, - The Fire Safety Manual Of The Building Should Be Updated, Note: In The Scope Of The Contract, The Contractor Must Estimate The Costs Of Accompanying Works (Including Plastering, Filling, Painting). Moreover: - The Contractor Will Provide A Certificate Of Installation Execution And An Operation Book, In Which All Information Related To The Operation Of The Installation Should Be Entered (Alarms, Damages, Maintenance, Shutdowns, Etc.), - The Contractor Will Provide A Report On The Correct Operation Of All Elements Of The Installation And The Correct Operation Of The Controls Implemented By The Ssp. - The Contractor Will Train Designated Facility Staff To Take Appropriate Actions When All Events Are Signaled By The Control Panel
|