|
Automatic Controller For Artesian Wells With Working Range From 0 To 150 Mca Voltage 220 Volts Brand, Hydrometer 3/4, Qmax. 5 M³/H, Class B, With Anti-Fraud Seals, Approved In Accordance With Ordinance 246/2000 Of Inmetro Main Regulation For The Manufacture And Homologation Of Water Consumption Meter In Brazil And In Compliance With The Standards Abtn Nrb 8194, Which Standardizes Details And Specifications Of Hydrometers, And Abnt 15538, Which Determines The Testing Of Efficiency For Water Consumption Meters, 360º Orientable Watch Shop With Stop, Easel Kit In Pvc Material, With Connections For Mounting The Kit, 1 20X3/4 Compression Adapter, 1 3/4 Screwable Plug, 1 Dn25 Ball Register And 4 Weldable 90 Knee With Brass Bushing Dn25x3/4; 40 Cm High, 2 Tubes, 2 Nuts With Metal Insert And 2 Sealing Washers, For Installing The 3/4 Water Meter, Metal Register Total Flow 2.1/2 (75 Mm), Metal Register Total Flow (60 Mm), 05/12/2025 - 11:29:25, Metal Register Total Flow 1.1/2 (50 Mm), Metal Register Total Flow 1 (32 Mm), Metal Register Total Flow 3/4 (25 Mm), Blue Anti-Fraud Seal For 3/4 Hydrometer, Steel Tube 6 Dn 154 Mm Wall 5.00 Mm-Br 6 Mts, Submersible Motor Pump 5 Hp Three-Phase, Submersible Motor Pump 3 Hp Three Phase, Submersible Motor Pump 2 Hp Three Phase, Submers Motor Pump 5 Hp Single Phase, Submers Motor Pump 3 Hp Single Phase, Submers Motor Pump 2 Hp Single Phase, Control Panel 5 Hp Three Phase, Control Panel 3 Hp Three Phase, Control Panel 2 Hp Three Phase, Control Panel 5 Hp Single-Phase, Control Panel 3 Hp Single-Phase, Control Panel 2 Hp Single-Phase, Flexible Cable Pp 3 X 16 Mm, Flexible Cable Pp 3 X 10 Mm, Flexible Cable Pp 3 Mts, Fg Tube 1.1/4 - Bar 6 Mts, Pvc Eductor Tube 2 - Bar 4 Mts, Pvc Eductor Tube 1.1/2 - Bar 4 Mts, Pvc Eductor Tube 1.1/4 - Bar 4 Mts, Fg Sleeve 2, Fg Sleeve 1.1/2, Fg Sleeve 1.1/4, Labor To Replace The Control Panel, Labor To Replace The Submerged Motor Pump, Flow Test With A 24-Hour Submerged Motor Pump With Generator Set, Water Analysis According To Iat Parameters For The Grant Process, Preparation Of The Grant Process Along With The Iat For Community Wells
|