Security Services – Sbad Delmenhorst-Bookholzberg. On Route 1500 (Oldenburg - Bremen), The Renewal Of Tracks 101, 102, 103, 104, Switches 101, 103, 105, 106, 110 And The Dismantling Of Switch 111 Into Track 103 Are Planned At Bookholzberg Station. The Existing Superstructure Will Be Renewed In Accordance With Db Ril 820. The First Construction Phase Begins At The Track End Behind Switch 105 And Extends To The Switch End Of Switch 113 And Includes Tracks 103 And 104. The Second Construction Phase Begins In The Connection Area Of The Switch End Of Switch 103 And Ends At The Switch End Of Switch 113. The Conversion Section Of The Third Construction Phase Begins In The Connection Area Of The Switch End Of Switch 101 And Ends At The Switch End Of Switch 115 In The Station Bookholzberg. The Bedding On Track 101 Will Be Cleaned Mechanically, And The Bedding In All Other Areas Will Be Completely Renewed. In Tracks 101 And 102 And Switches 101 And 103, A Subgrade Improvement Is Planned By Installing A Subgrade Protection Layer (Kg 1/Kg 2; D = 30 Cm). In The Fourth Construction Phase, A Grade Improvement (Kg 2; D = 30 Cm) Will Be Carried Out Using A Conventional Conversion Process On The Delmenhorst - Bookholzberg Track, Route 1500, Over A Length Of 2,069 M. Direction Of Work: According To The Approved Construction Schedule <== Safety Services Are Required For This.
Contact Information
Address
Adam-Riese-Straße 11-13
Contact No.
+49 61311570011
Email
jacqueline.becht@deutschebahn.com
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 105871045
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.