Concrete Repair Work – Heepen Sewage Treatment Plant Digester Ii+Iii - Concrete Renovation. The Two Digester Tanks Are Prestressed Concrete Structures In A Round/Ovoid Design, Each With A Capacity Of Approx. 3,200 M3. The Top Of The Funnel Is Approximately 9.00 M Below The Upper Level Of The Terrain, The Top Of The Wall Of The Gas Dome Located In The Digester Head Is Approximately 14.5 M Above The Top Of The Terrain. Scope Of Services: - Subsurface Pretreatment Of The Reinforced Concrete - Wall And Ceiling Surfaces Removal Down To Healthy Core Concrete, Including Complete Removal Of The Old Coating - Full-Surface Inspection Of The Surfaces, Including Chiseling Out Any Defects - Reprofiling Of The Defects - Positive Compression Of Any Cracks Found - Fine Filling Of The Pre-Treated Reinforced Concrete Surfaces - Application Of An Epoxy Resin Coating - Concrete Renovation In Places On The Outside Of The Fb - Concrete Renovation Of The Concrete Rings At The Head Of The Digester
Contact Information
Contact No.
+49 5215165428
Email
Matthias.Neum@bielefeld.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 105870730
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.