Civic Centre Construction Work – Bauvorbereitung. Scope Of Services / Rough Quantities: The Tlrz Data Center Location At Ludwig-Erhard-Ring 2 In Erfurt Is To Be Expanded And Modernized To Meet The Ever-Growing Requirements Of The Thuringian State Administration. The Free State Of Thuringia, Ultimately Represented By The Thuringian State Office For Building And Transport, Intends To Carry Out A Thorough Renovation Of The Existing Building And A Structural Expansion Of The Data Center On The State-Owned Property On The Site Of The Authority Center At Ludwig-Erhard-Ring 2 In Erfurt. The Location Is On The Ludwig-Erhard-Ring Campus In The Southeast Of The State Capital Erfurt In The Daberstedt District. The Construction Site For The Expansion Is Located North Of The Existing Tlrz Building, Which Was Completed In 2003. In Addition To The Tlrz, The Thuringian Ministry Of Finance (Tfm) As Well As A Canteen Building, Garages And Parking Spaces Are Located On The Campus. Rough Quantities: Take Up 30 M Of Fence In Sections. Set Up 30 M Of Fence In Sections. Take Up 20 M Of Angle Support Wall, In Sections, Prefabricated Part Height 1 To 2 M. Make 20 M Of Angle Support Wall, In Sections, Prefabricated Part Height Of 1 To 2 M. 250 M. Make Protective Fence For Plants. Make 12 Pieces Of Protection For Tree Trunk. Make 100 M Of Construction Water Connection. Make 40 M Of Root Curtain Mow The Vegetation Area, Clear And Restore 100 M2 Of Bushes, Remove And Restore 1,200 M2 Of Topsoil, Including Vegetation Cover, If Necessary In The Production Area Of Collector Corridors, Remove And Restore 4,000 M2 Of Topsoil, Including Vegetation Cover, If Necessary, On The Be Area Produce Bk 1.8 In The Yard Area, Expand And Restore 13 M Box Gutter In Sections, Pick Up 130 M2 Paving Surface Made Of Concrete Paving Stones, Pick Up 160 M Curb, Break Off 20 M Pipe Up To Dn 150, Lay 10 M Sewer Dn 250 In The Yard Area, Install 1 Shaft Dn 1,000 Mm, Depth 1.5 - 2.0 M On Existing Pipe 650 M3 Soil In Accordance With The Profile, Loosen Depth Up To 1.2 M, Pre-Cut Collector Corridors 1 And 2, Create 15 M Sewer Dn/Od 315, Connect To Existing Shaft In The Ludwig-Erhardt-Ring With 20 M2 Road Surface, Asphalt Ludwig-Erhardt-Ring And Restore And 20 M2 Of Pavement, Paving Surface, Take Up And Restore 1 Pc Shaft Dn 1,000 Mm 1.5- 2.0 M Produce 30 M Connection Cable Dn/Od 160 Pp Produce 12 M2 Concrete Ceiling For Installation Area Of External Tanks 110 M Cable Trench Produce Video Surveillance Including Cable Ducts Dismantle And Restore 2 Video Masts
|