Construction Work For Water Projects – Lößnitzbach Radebeul Ba3 Water Engineering Complex Project. Clearing Of Construction Sites: Dismantling Of Pavements And Structures (Existing Passage) - Clearing Of Root Stumps (Trees And Bushes Have Already Been Felled) Within The Areas With Soil Removal As Well As In Areas With Land Use During Construction - Securing And Relocating Existing Infrastructure Systems (Electricity Supply Systems, Tw, Rw, Etc.) By, Among Other Things, Creating Construction Pits - Topsoil Removal And Interim Storage For Later Reinstallation, Removal/Utilization Of Excess Masses - Civil Engineering: Construction Of The Bw 3 Crossing Structure In The Area Of The Crossing Elbe Cycle Path, Implementation In 2 Construction Phases - Terrain Modeling To Create The New Watercourse In The Inlet Area To Bw 3, Removal/Utilization Of Excess Masses - Construction Of The Lößnitzbach Confluence Structure Into The Elbe Downstream Of The Bw 3 - Engineering-Biological Bed And Bank Protection As Well As Installation Of Structuring Measures To Promote The Dynamic Development Of The Body Of Water - Ecologically Consistent Design Of The Body Of Water, In Particular The Creation Of Ecologically Consistent Bed Structures In Areas With A High Longitudinal Gradient As Well As In The Planned Crossing Structures
Contact Information
Address
Pestalozzistraße 6
Contact No.
+49 351-8311-714
Email
vergabe@radebeul.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 105870533
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.