1. The Subject Of The Order Is The Construction Of A Sidewalk With Lighting On The Street. Sowia In Tarnów Podgórne – Stage I.2. The Material Scope Of The Task Being The Subject Of The Proceedings Is Described In Detail In The Design Documentation, Technical Specification For The Execution And Acceptance Of Works, And The Bill Of Quantities. Possible Catalog Items Are Provided Only To Facilitate The Calculation - Their Use In The Valuation Is Not Obligatory. The Technical Specification, Bill Of Quantities And Design Constitute An Annex To This Specification. The Quality Requirements Of The Elements Constituting The Subject Of The Order Are Described In The Design Documentation, In Particular In The Technical Specification For The Execution And Acceptance Of The Works. 3. The Ordering Party Requires That The Subject Of The Order Be Covered By An 84-Month Warranty And Guarantee Period, Provided That The Warranty And Warranty Period For Thick-Layer Horizontal Markings Is 36 Months And For Thin-Layer Markings Is 12 Months.4. The Contractor Will Prepare As-Built Documentation.5. The Contractor Must Indicate In Its Offer Which Elements Of The Order It Intends To Entrust To Subcontractors. 6. The Subject Of The Contract Is Defined In The Common Procurement Vocabulary With The Symbol: 45 00 00 00-7, 45 23 30 00-9, 45 10 00 00-8, 45 23 00 00-8, 45 20 00 00-9, 45 31 61 10-9, 45 11 27 10-5, 45 23 14 00-9, 45 23 32 90-8, 45 23 32 80-5, 45 11 12 40-2.7. The Contractors Obligations And At The Expense Of The Contractor Also Include: A) Costs Of Laboratory Tests, B) Landfill Fees Related To The Removal Of Soil And Excess Excavated Material, C) Fees For Temporary Storage Of Excavated Material, D) Repairs Of Roads And Streets Damaged During The Works By Means Of Transport And Construction Machines Employed On The Construction Site And Vehicles Using Detours, E) Elimination Of The Effects Of The Construction Process On The Construction Surroundings, F) Costs Of Water Discharge After Tightness Tests And Sludge Purification Ditches (Collectors) After Rinsing Pipelines And Inlets, G) Costs Of Cutting Down Trees And Bushes, H) Development And Implementation Of A Temporary Traffic Organization Project For The Duration Of The Works, I) Compensation For The Destruction Of Crops And Greenery, J) Archaeological Supervision, K) Preparation Of A Quantity Survey Book, L) Surveying Services Along With An As-Built Inventory And Possible Correction Of Elevations To Adapt To The Existing Entrances And The Area Adjacent To The Construction Site, L) Preparation As-Built Inventory In 4 Copies And Submitting It To Podgik Of The Poznań County.8. The Contractor Will Use Materials With Technical, Construction And Operational Parameters Not Worse Than Those Specified In The Technical Specification And Design.9. The Ordering Party Pursuant To Art. 95 Section 1 Of The Public Procurement Law, Requires The Contractor Or Subcontractor To Employ, On The Basis Of An Employment Relationship, Pers
Contact Information
Address
Gmina Tarnowo Podgórne,Tarnowo Podgórne,62-080,Wielkopolskie,Pl418 - Poznański
Contact No.
618959235
Email
zp@tarnowo-podgorne.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 105860953
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.