|
1. The Subject Of The Order Are Construction Works For The Construction Of The Volunteer Fire Department Garage Building In The Town Of Płoskie.2. Place Of Investment Implementation: Plot No. 656/9, Town Of Płoskie, Precinct 0015 Płoskie, Zamość Commune3. Volunteer Fire Department Garage Building - A Single-Story, Single-Story Building With No Basement, Rectangular Brick Technology. Length - 12.88 M, Width - 19.88 M, Height - 8.32 M, Building Area - 256.05 M2, Paved Area - 975.70 M2, Number Of Rooms - 11.4. The Scope Of The Investment Includes The Construction Of A Building - The Volunteer Fire Departments Garage4.1 Construction And Construction Works Include: • Earthworks, • Construction Of Foundations, • Construction Of External And Internal Walls, Including Plasters And Plasters, • Insulation, • Insulation Of External Partitions, • Construction Of The Ceiling, • Construction Of The Roof Structure, Including Covering, Gutters And Sheet Metal Work, • Construction Of Ceilings, Including Plasters, • Construction Of Facades, • Installation Of Windows And Doors, External And Internal, • Performance Of Internal And External Finishing Works, 4.2 Sanitary Industry Works Include, Among Others: • Construction Of Sanitary Sewage System, • Construction Of Internal Water Supply System, • Construction Of Central Heating And Ct Installations, • Construction Of Gas Boiler Room, • Construction Of Internal Gas Installation, • Construction Of Mechanical Ventilation, • Installation Of Aggregates Condensing Units, • Construction Of A Water Supply Connection, • Construction Of An External Sanitary Sewage System, • Installation Of A Septic Tank, • Construction Of An Underground Gas Installation, • Construction Of A Section Of The Water Supply Network, 4.3 Electrical Works Include, Among Others: • Construction Of A Pre-Meter Connection, • Construction Of Area Lighting, • Installation Of A Spun Pole For An Alarm Siren, • Construction Of External And Internal Electrical Installations, • Construction Of A Board Distribution System,• Construction Of A Lightning Protection Installation,• Construction Of An Earthing Installation,• Construction Of A Monitoring Installation, 4.4 Area Development:• Construction Of A Parking Lot, Hardening Of The Area, Exit,• Construction Of A Fence Only For Part Of The Plot Including The Garage,• Construction Of An Alarm Siren,• Installation Of Small Architecture,Note:The Design And Cost Estimate Documentation Covers The Building Of The Community Center And The Garage Of The Volunteer Fire Department.The Scope Of Construction Works Does Not Include The Construction Of The Building Of The Community Center Together With Development Of The Area Around The Building In Question. The Scope Of Works Includes Only The Construction Of A Garage With Development, The Indicated Area To Be Completed Is Marked With Abcd Points - Appendix No. Athe Plot In Question Is Not Equipped With Electricity. In Accordance With The Connection Conditions Issued By
|