|
1) The Subject Of The Order Are Construction Works Related To The Continuation Of The Construction Of A Sports Hall Building With A Connector In Babica, Which Were Interrupted For Reasons Beyond The Control Of The Ordering Party. The Investment Is Located On The Premises Of The School Complex. Jana Pawła Ii In Babica On Plot No. 1232. A Sports Hall Building Designed For Approximately 180 People (Approx. 60 In The Gym, Approximately 15 People Each In The Multi-Purpose Room And The Gym, And 90 People In The Audience). The Hall Building Has An Irregular Shape, Which Can Be Inscribed In A Rectangle With Dimensions Of 33.05 X 31.65 M, Connected To The Existing School On The First Level By A Connector. Floors. A Two-Story Building, Without A Basement, Traditional Construction, Brick And Reinforced Concrete Walls, A Roof Over The Gymnasium On A Structure Made Of Glued Timber Girders, A Gable Roof With An Angle Of 15°, And Over The Remaining Part There Is A Flat Roof With A Slope Of 1.15°. The Roof Covering Over The Gymnasium Is Made Of Sheet Metal. Building Volume - 9,926 M3 Building Area - 1,010.66 M2 Usable Area - 1,254.89 M2 Building Dimensions - 33.05 X 31.65 M Building Height - 11.92 M2) The Order Should Include The Following: - Service Building - Sports Hall With A Connector To The Existing One School, - Pedestrian, Pedestrian And Driving Routes - Roads, Sidewalks And Parking Spaces, - Solid Waste Collection Point - Garbage Shelter, - Exit From District Road No. 1411R (Plot No. 1233), - Fence With A Gate, - Plantings, - Technical Infrastructure: External Storm Sewage System, Rainwater Retention System, Low Voltage Power Connection, External Installation Teletechnical Sewage System, Area Lighting, External Monitoring Installation And Photovoltaic Installation With Energy Storage, - Demolition Works, - Land Development.3) The Subject Of The Order Does Not Include The Following Construction Works That Have Already Been Completed: - External Installation Of A Water Supply Connection And Sanitary Sewage System And Installation Of A Fire Hydrant, - Reconstruction Of The Water Supply Connection, - Reconstruction Of The Network And Gas Connection, - Part Of The External Rainwater Drainage System (Section From D3 To D9 Along With Approaches For Downpipes, Section From D2.2 To D2.4 Along With Approaches For Downpipes, No Well D.2.2) - Internal Sanitary Sewage System Under The Ground Floor, - Internal Rainwater Drainage System Under The Ground Floor, - Construction Of Footings And Foundation Footings As Well As Foundation Walls, Without The Foundation, Batten And The Upper Part Of The Foundation Footings, Item 1.11, Item 1.10, Item 1.9, - Execution Of Vertical Moisture-Proof And Thermal Insulation Of Foundation Walls, - Execution Of Floor Slabs With The Exception Of The Slab Item 2.1 - Execution Of Reinforced Concrete Walls On The Ground Floor In Axis A, C, B, 11 And In Axis 13 Between Axes A And D Up To A Height Of Approximately 3.80 M To The Floor Level, -
|