|
Engineering Design Services For The Construction Of Civil Engineering Works - Preparation Of Complete Design And Cost Estimate Documentation Along With Obtaining The Opinions, Arrangements, Administrative Decisions And, If Necessary, Water And Legal Permits Required By The Act Of July 7, 1994, For The Task: Construction Of Water Facilities In The Forest District Kłobuck. 1. The Subject Of The Order Is The Development Of Complete Design And Cost Estimate Documentation Along With Obtaining Opinions, Arrangements, Administrative Decisions And, If Necessary, Water And Legal Permits Required By The Provisions Of The Act Of July 7, 1994, Construction Law (Consolidated Text: Journal Of Laws Of 2025, Item 418, As Amended), As Well As Providing Authors Supervision Over The Documentation For The Task: Construction Of Water Facilities In The Kłobuck Forest District In As Part Of The Project Entitled A Comprehensive Project On The Adaptation Of Forests And Forestry To Climate Change - Small Retention And Counteracting Water Erosion In Lowland Areas - Continuation (Mrn3). 2. The Construction Of Water Facilities In The Kłobuck Forest District Consists Of The Following Tasks: A) Task Number: 02-12-1.1-02 (Reservoir) - Reconstruction Of The Reservoir In The Rybno Forest District Location: Rybno Forest District, Forest Address: 02-12-1-12-555-G B) Task Number: 02-12-1.1-03 (Reservoir) –Construction Of A Reservoir With A Dike And An Overflow Device In The Zagórze Forestry In The Section 410 I, Location: Zagórze Forestry, Forest Address: 02-12-1-09-410-I C) Task Number: 02-12-1.1-04 (Reservoir) - Construction Of A Reservoir With A Dike And An Overflow Device In The Zagórze Forestry In The Section 410 G, Location: Zagórze Forestry, Forest Address: 02-12-1-09-410-G D) Task Number: 02-12-1.1-05 (Reservoir) - Construction Of A Reservoir With A Dike And An Overflow Device In The Zagórze Forestry In Section 406 H, Location: Zagórze Forestry, Forest Address: 02-12-1-09-406-H E) Task Number: 02-12-1.1-06 (Reservoir) - Construction Of A Reservoir With An Overflow Device In The Zagórze Forestry In The Section 399 C, Location: Zagórze Forest, Forest Address: 02-12-1-09-399-C F) Task Number: 02-12-1.1-07 (Reservoir) - Creation Of A Floodplain By Building A Threshold And Restoring An Old Dike, Location: Bartkówka Forest, Forest Address: 02-12-1-10-444-B G) Task Number: 02-12-1.2-01 (Culvert With Damming) - Reconstruction Of The Culvert In The Rybno Forestry, Location: Rybno Forestry, Forest Address: 02-12-1-12-551-C H) Task Number: 02-12-1.2-02 (Threshold And Culvert) - Construction Of The Threshold And Reconstruction Of The Culvert In The Zagórze Forestry Location: Zagórze Forestry, Forest Address: 02-12-1-09-398-A I) Task Number: 02-12-1.2-03 (Threshold And Culvert) – Threshold With An Overflow Device And Reconstruction Of The Culvert Into A Culvert With A Larger Diameter In The Zagórze Forestry Location: Zagórze Forestry, Forest Address: 02-12-1-09-388-D J) Task Number: 02-12-1.2-04 (Threshold) - Construction Of A Threshold In The Zagórze Forest District Location: Zagórze Forest District, Forest Address: 02-12-1-09-398-B K) Task Number: 02-12-1.2-05 (Threshold And Culvert) - Construction Of A Threshold And Culvert In The Zagórze Forest District Location: Forest Address: 02-12-1-09-386-B L) Task Number: 02-12-1.2-06 (Threshold) – Construction Of A Threshold In The Bartkówka Forestry In The Section 459 A, Location: Bartkówka Forestry, Forest Address: 02-12-1-10-459-A M) Task Number: 02-12-1.2-07 (Threshold) - Construction Of A Threshold In The Bartkówka Forestry In The Section 444 F, Location: Bartkówka Forest, Forest Address: 02-12-1-10-444-F N) Task Number: 02-12-1.2-08 (Threshold) - Construction Of The Threshold In L
|