|
Tender for Transporting Of Poles From Road Site To Pole Pit Including Loading And Unloading Of Poles By Using Jcb , Excavation Of Structure Pole Pit Medium( Soil) , Erection Of 9.14Mm/9.00 M 400 Kg Pole Psc Pole , Mass Concrete For Pole (All Materials Supplied By Contractors) , Fixing Of Tapping Channel 1 Set , Erection Of Grouping Swtich 1 Set , Painting Structure Colour Poles( Distember/ Snow Cem Supplied By Contractor) , Earthing Complete With Pipe ( Earth Trough Suppled By Contractor) , Excavation Oof Stay Pit By Jcb Or Manual , Erection Of Stay Set Complete , Stay Concreting , Labour For Excavating And Refilling Of Earth /Trench For Earthmat, Cable, Etc., Of Any Size/Depth Narrow Excavation For Normal Clay/Hard Grave Soil As Directed By The Field Engineer. , Labour For Excavating And Refilling Of Earth /Trench For Earthmat, Cable, Etc., Of Any Size/Depth Narrow Excavation For Semi Density Rock Soil As Directed By The Field Engineer. , Labour For Excavating And Refilling Of Earth /Trench For Earthmat, Cable, Etc., Of Any Size/Depth Narrow Excavation For Medium And Dense Medium Soil (Without Blasting) As Directed By The Field Engineer. , Plain Cement Concrete 1:3:6 Using 40 Mm Hbs Jelly Including Cost Of All Materials, Lead, Lift, Etc., Complete Without Form Work. With Electricity Supplied By Department At Free Of Construction , Plain Cement Concrete 1:3:6 Using 40 Mm Hbs Jelly Including Cost Of All Materials, Lead, Lift, Etc., Complete Without Form Work With Electricity Supplied By Department At Free Of Construction , Plain Cement Concrete 1:2:4 Using 20 Mm Hbs Jelly Including Cost Of All Materials, Lead, Lift, Etc., Complete With Form Work With Electricity Supplied By Department At Free Of Construction , Plastering With Cm 1:3, 12 Mm Thick Including Cost Of All Materials, Lead, Lift, Curing Etc., Complete. , Brick Work With Cm 1:6 Using Second Class Bricks Of Size 9X 4 3/8 X 2 3/4 Including Cost Of All Materials, Labour, Lead, Lift, Curing Etc., Complete ( As P
|